My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
318 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
318
>
318 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 1:29:18 PM
Creation date
2/13/2017 8:20:10 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
318
Notes
PRECISION TRANSMISSION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date�-n r�� � <br />Application For <br />PUBL9C WARKS PERMiT <br />Print or Type ONy <br />Owner <br />Applicant <br />Describe Proposed Work ���� LL// C./� <br />Project Address (if known) <br />City <br />Attach fcur (4) copies of plans for proposed work - Draw to �cale and note the following as <br />• Froperty Lines <br />• Outline and dimensions ot all existing and <br />propo�ed structures on the lot <br />O Existing and proposed utilities <br />PUEIie Worka Permit • <br />emp. oec� • <br />Public Worka F¢e <br />Tolal Fee $ <br />Less ApO� Fes Paltl $ <br />Balanca Oue $ <br />• Centerline of street <br />• Indicate North <br />• Show any pruposed grading changes <br />• Show measurements <br />PENMIT CONDITIONS <br />t. All calls for inspection shall be made 24 hrs. in advance • phone 259-881 5. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Lncation Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800•424•5555. <br />�or �� �%�j� <br />� <br />���/2 ��a�' <br />/ <br />tor Construction <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />� <br />� <br />� <br />O <br />� <br />� <br />� <br />a <br />Tne undersigned owner/applir.ant hereby agrees to hold and save harm- � <br />less the City of Everett trom any and all claims for damages, costs, I <br />expenses, or causes ot action that may arise hecause of installation '�� <br />and mainlenance of ihe improvement or other right-ohway use hereto ' <br />applied (or and further 2nrees to remove same upon notice from the � <br />Date City and to raplace public property damaged thereby. . <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />� 3200 Cedar Street <br />Everelt, WA 98201 <br />Phone: 259-E815 <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERM�T IS ISSUED AND THEREAFTCR IS TO <br />BE DILIGENTLY PURSUED TO C0�4PLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATIrJN. �� �- <br />
The URL can be used to link to this page
Your browser does not support the video tag.