Laserfiche WebLink
4. In order ta minimize erosion, any spoil piles must be covered with plastic sheeting or other <br />impervious covering staked to the ground or anchored with rocks or sandbags. Bertns, earthen or <br />otherwise, should be constructed at the perimeter of excavated areas to prevent adjacent sRe runoff <br />from entering the excavations. (SEPA EaRh and Water Policies) <br />5. If contamination of the surrounding soils is discovered, and remediation will take place, an erosion <br />control plan must be submitted for approval by the Public Works Department. (SCPA Earth and <br />Water Policies) <br />The lead agency for this proposal has determined that it does not have a probable significant adverse <br />impact on the environment. An Environmental Impact Statement is not required undor RCW <br />43.21 C.0302(23)(c). This determination assumes compliance with State law and City ordinances related to <br />general environmental protection including but not limited to right-of-way improvement requirements, <br />drainage, etc. This decision was made after review of a completed environmental checklist and other <br />information on file with the lead agency. This information is available to the public on request. This <br />Mitigated Determination of Non-Significance is specificady conditioned on compliance with the conditions <br />attached hereto which are incorporated by reference as if fully set for#h herein. <br />This Final MDNS is issued under WAC 197-11-355. A 14-day public comment period for this proposal has <br />been completed. <br />Responsible <br />Official: <br />Address: <br />Date: <br />Signature: <br />Allan Giffen, Director, Planning and Community Development <br />2930 Wetmore Avenue, Suite 6-A, Everett, WA 98201 <br />June 21 <br />You may appeal this det ination by filing an appeal on forms provided by the Planning Department and a <br />fee to the Planning a Community Development Permit Services Counter at 3200 Cedar Street, 2nd Floor, <br />no later than 14 da s from the date above. <br />Contact David Tyler to read or ask about the procedures for SEPA appeals. <br />Notes: <br />1. A MDNS may be withdrawn in the event of significant changes in the proposal, disclosure of new <br />significant information, misrepresentation by the applicant, or failure to comply with the conditions <br />upon which this Mitigated Determination of Non-Significance is predicated. <br />2. This land use permit shall terminate i'!he applicant does not apply for a building permit within 18 <br />months (or, with an extension, 24 months), except where a time limit on the land use permit is <br />othenvise established under federal or state law, city ordinance, or an executed development <br />agreement. <br />1 '\ <br />