My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
406 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
406
>
BASE FILE
>
406 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 3:45:08 PM
Creation date
2/13/2017 8:23:41 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
406
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earth <br />Consultants Ince <br />Geotechnical Engineering and Geology <br />May 16, 1986 E-2976 <br />Auto Mall Associates <br />1800 West Dayton, Suite 202A <br />Edmonds, Washington 98020 <br />Attention: Mr. Dick Beselin <br />Gentlemen: <br />We are pleased to submit herewith our report entitled "Geotech- <br />nical Engineering Study, Proposed Auto Retail Center, 306 SE <br />Everett Mall Way, Everett, Washington." This report presents the <br />results of our field exploration, laboratory tests, and <br />engineering analysis. <br />Our test pits encountered granular till soils beneath the <br />site. The proposed structures may be supported on conventional <br />shallow spread and/or continuous footings bearing on either <br />competent native soils or on structural fill. Higher bearing <br />values may be utilized for footings bearing on dense undisturbed <br />till soils that are generally present approximately four feet <br />below existing site grades. <br />This report has been prepared for specific application to this <br />project in accordance with generally accepted geotechnical <br />engineering practices for the exclusive use of Auto Mall <br />Associates and their representatives. No other warranty, <br />expressed or implied, is made. We recommend that this report, in <br />its entirety, be included in the project contract documents for <br />the information of the contractor. The following sections of this <br />report describe our study and contain recommendations regarding <br />foundation design criteria, earthwork considerations, and site <br />drainage. <br />PROJECT DESCRIPTION <br />At the time our study was performed, the site and proposed <br />building locations were as shown schematically on the Test Pit <br />Location Plan, Plate 2. <br />1805 136th Place NE., Suite 101, Bellevue, Washington 98005 / Bellevue (206) 643-3780/Seattle (206) 464-1584 <br />
The URL can be used to link to this page
Your browser does not support the video tag.