Auto Mall Associates <br />May 16, 1986 <br />E-2976 <br />Page 4 <br />Dn structural fill placed above competent native soils. Fill <br />placed under footings should extend outwards from the edge of the <br />footings at least a distance equal to the depth of the fill. <br />�SSar Exterior footings should be bottomed at a minimum depth of twelve <br />(12) inches below the lowest adjacent outside finish grade. <br />Interior footings may be at a depth of twelve (12) inches below <br />the top of the slab. Footings founded on very dense native till <br />a-vy� soils may be designed for an allowable soil bearing capacity of <br />lY six thousand (6000) pounds per square foot (psf). Footings <br />bearing on structural fill or recompacted upper site soils should <br />be designed for a hearing pressure of twenty five hundred (2500) <br />psf. Continuous and individual spread footings should have <br />minimum widths of twelve (12) and eighteen (18) inches, <br />respectively. A one-third increase in the above bearing pressures <br />may be used when considering short term wind or seismic loads. <br />For the above design criteria, it is anticipated that total <br />settlements of footings founded on dense till soils and on fills <br />less than five feet thick will be about three-quarter inch, with <br />differential settlements of one-half inch. Almost all settlements <br />should occur during construction. If any continuous footings are <br />located partially in cut and partially in fill, we recommend that <br />the structural engineer consider adding additional reinforcement <br />in the footings and footing walls near the cut -fill transition <br />line to minimize the possibility of structural damage due to <br />differential settlement. Isolated spread footings should be <br />extended to natural soils in the transition zone. <br />Lateral loads due to wind or seismic forces may be resisted by <br />friction between the foundations and the supporting compacted fill <br />subgrade or by passive earth pressure on the foundations. For the <br />latter, the foundations must be poured "neat" against the existing <br />soil or backfilled with a compacted fill meeting the requirements <br />of structural fill. A coefficient of friction of 0.35 may be used <br />between the structural foundation concrete and the supporting <br />subgrade. The passive resistance of undisturbed natural soils and <br />well compacted fill may be taken as equal to the pressure of a <br />fluid having a density of three hundred (300) pounds per cubic <br />foot (pcf). <br />We recommend that drains be placed around all perimeter foot- <br />ings. The drains should be constructed with a four inch diameter <br />perforated pipe bedded and covered with free draining gravel. The <br />drains should have a positive gradient towards suitable discharge <br />facilities. The footing drainage system should not be tied into <br />the roof drainage system until the drains are tightlined well away <br />from the building. The footing excavation should be backfilled <br />with granular soil except for the top foot which should be <br />backfilled with a relatively impermeable soil such as silt, clay <br />or topsoil. P.lternatively, the surface can be sealed with asphalt <br />or concrete pavements. <br />Earth Consultants, Inc. <br />