Laserfiche WebLink
:,� <br />everett <br />:, <br /><:,7� a; <br />a ", z.'�`� <br />1l�ISP�:�TItaN REPORT <br />i <br />. / �_,� � / � / . ► <br />. . r.�_/ �. �/ � �/ .� <br />—, — <br />� <br />• . .,' �' �� . <br />► � <br />� . - : �YI <br />• • • • � <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />C�LEC: Pmt. No. �_❑ PLBG: Pmt. No. <br />❑ Temp. Elect. � Framing � Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />O Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Duclwork ❑ Grid �{� Struct. Slzb <br />❑ Wood Stove ❑ Rough-In [S�final <br />❑ Masonry ❑ Service '[j <br />�fiPPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION �?EQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to per(orm inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANGY. <br />inspector %� � <br />