Laserfiche WebLink
7411d Gencral: Equipmentshall havc a minimum peilormance nlMc <br />specilied rating tonditions not lesa than t�e values shown in Table 144A <br />Nmuqh 14�1G. II a natianally rocoB�aeE cmli/ication pmgram et1515b� a <br />productcovemtl in Tables 74.1P lhmuBh 1d4G, anE ilinclvdes pmvisions <br />lot veril¢ation and challen0� of eQulpmenl elGcienry �atinps, lhen the <br />pmtlucl shall be IisteO In Iha ceM1diwiron pmpram. <br />Oas-liicd and oll-fired lorcetl air lumaces wdh inpul roGnps? 225,000 <br />�W/h (85 hW) shall ulso Aavv an inte�millenl lgnition o� Intermp�etl tlavice <br />(IID), and have either mechaninl Grafl (incluEinp powervenlinp) ora Nue <br />Eampec A vont tlamper ia an acceplablo almmative lo a Ilve damper lor <br />fumacas w�are combuslion air is tlrawn Imm l�e condrtionetl s0ace. FII <br />IumaceswM1h Input mting%' 225,OU� Btvlh (OS kW), Inclutlinp elecVic <br />Wmoces, lhal a�e nol lowbd wdhin Ne conEitianetl epace s�ell �ave <br />jackat losse� not eMceediny 0.75X ot Ihe �nput ralinq. <br />14N.2 Rating Condltions: Gonling epuipment ahall be rated at ARI test <br />condifions ontl pmcedures when available. W hem no applicable <br />pmcetlures etist, tlata shall be Iwnis�oC by Ihe equipmeni manulacWror. <br />14f 1.7 ComClnatlon Spaco ontl Servico Watnr Heating: fo� <br />combinalion spaca and servica walar hmters wiih a p�incipal hnclion ol <br />pmvidln8 space heol, the CombineE Annual Elficiency (CAE) may be <br />calculaletl Cy ming PSHRAE StantlarE 12<•1981. Sto�ape waler �eaters <br />useE in cambinetion space heet and waler heat epplicalianc cAoll �ava <br />eilhet an Ennav FAcmr (EF) or a CAE aluot less t�en t�e lollowinp: <br />f411.4 PackagoG Eloctric Noating anE GoaIInB Equlpmant: PackagaE <br />eleclric equipment pmviding poth healinB and caoling wiN a tolal cooling <br />capaciry gmaterUan 20,000 BiWh shall be a hoal pump. <br />Exceptlon: Unsbliatl a0uipmont s�aeitors ar cehlnaU usa0 <br />solely loi Oorsanal wiwless service IacilM1ias. <br />141Y Conlrols <br />741Y.1 Tamparatur¢ Contrais: Ea<� syctem s�all be pmvitled with at <br />Ieast one �emperalura conUol tlevice. Each zone sh�ll be contralletl by <br />inErvitlual t�e�mostalic canlmis �espanEinp to IempemWm wR�ln lAe ione. <br />At a minimum, each ilao� ol a building shall0e cansidcred oe o veparele <br />zone. <br />1412.P DeatlOanE CanlrOls: W�en usad la conirol bot� comlorl haating <br />antl coalinp. iono lhvrmosialic canimis shell bc capeblo oi e Ceadband at <br />a[ laast 5 degroes F wiNin which t�e supPly ol hea�ing and coolinp enupy <br />to thc zone is shut oll or mducetl �o a mmimum. <br />Ezceptlons: <br />1. Specialaccupency,apenalusago,orcoEeteqaimmenls <br />wAom Eoedband con�mL• arrt mta00�optiate. <br />�. BWidingc complyin8 wil� Sac�ian 11A1 d, il in Ihe pmposaE <br />Cuilding enerpy analysis, heating and cooling Nermosbt <br />setpoinls a�e cel to Ihe same Icmpe�alu�a belween 70 <br />JeBrees F and 75 deBrecs F inclusrvo, and ascumetl b be <br />canslant m�oughoul the ycai. <br />3. Thermastalslhalreqwromanualchanpvoverbetweon <br />hcalin9 antl rooling modas. <br />1471.J Hum Itlity Controle: II a syatem Is equipped wilh a means lai <br />ntltlin0 maisiure, a �umidis�al shall be provitletl. <br />141Y.4 Sclback and S�uL011: HVAC systems z�all ba oquipPatl wiV� <br />automatic canirols capoble ot accomplis�in9 a reCuclion ol enorpY uee <br />thwup� conbol satback or equipment shutdown AurinB Periods ol non�usa <br />or aitemato use ol t�e cpacee served by Iha sy¢Iem. The automalic <br />cont�als shall havn a minimum seven�day clock antl be capaCle ol being <br />so� lor sevon tllllomn� day rypes pe� woak. <br />Exceptlons: <br />1. Systems serving areas whlch require conlinuous apoeoGon al <br />tM1e cama tampanWm salpoint. <br />2. EQuipmentwiih Iuli loaE tlemands a12 kW (8,828 91ulh) or <br />lezs may be controliatl by readily accessiblo manual a�Lhour <br />conirols. <br />1412.9.1 Dampers: Oubide an Iniakes, eNauel ouilols antl relicl oulleis <br />scrving cnndi�ionod sparos shall be equippeE wi0 damperswhich clase <br />automatically w�en I�e system is o�l or upon po�..m taiWm. <br />Eviceptlons: <br />1. Systems serving emas w�ic� mquim conlinuous ope�ation. <br />. Cambuelionairintakes. <br />3. Graviry (nonmotorizeC) tlampers are acceptaEle In builClnpe <br />less than 3 slaties in heigM. <br />4. Gravily (nonmotoriietl) tlampe�e are acceplablo In eahavnt <br />antl reliei ouVets in I�v firzl etory antl levels belaw the lirst <br />ctory al buildinps lhme or mara staries in heighl. <br />191Y.O.Y Optlmum Stah Can[mis: Hmlinp anC cooliny systeme wilh <br />dcsign sapplyaircvpacitiv. caccedinp 10,000 clm shall havo optlmum <br />atart controls. Optimum atart contmis shall ba desi9nod to aulomatically <br />adjuei Ihe start limo ol an HVAC system oach day lo btinB ��e spaca lo <br />tlesiretl eccupietl romOmaNre levels ImmeEiately belore schetlulatl <br />accupancy. T�e control algo�ilhm s�all, as a minimum, Ee a lunction ol Ne <br />dil/eronco be�vom soacv IemperaNro end occupied setpoint untl the <br />omounl of Ilmo peior 1a schetluleC oeeupeney. <br />14/25 Hvat Pump Cantrols: Unitary alr coaleE �eul pumps sAell inclutle <br />micmpmcessor conbols Ihat minimize eopP�"mental heat usaBe tluring <br />slart•uD. �eFup, and Eebost canditions. These conlmis shall anticipate <br />necd lon c�ai antl use comprcsslon healin9 as t�o lint ai�pe at heat. <br />CaNmis sha111nJiwlv whon zupPlemanlal healinp is Ooinp uwC Ihrough <br />vlsual mearm �e.g., LED Intllcalun). <br />1412.6 ComEusUon Meatinp Equlpment Controls: Cambutlian �ealinp <br />oqoipmenl wilh a capaeiiy ovm 235,OOOBIu/� shall have motlulalinp o� <br />sta➢etl cambustion conlml <br />Ezeeptlons: <br />i eon��s. <br />I. RatllanlHealers. <br />sAall havc a mcans lo� Ealancing, includlnB �ul nol4mikE lo, Campen, <br />IemperaNre and pmssure �esi cannections antl balancinp vaNes. <br />7473 Alr Economli¢rs <br />7473dOpa�atlon: Pirecanamrseroshalibaotautomalinllymotluiating <br />ouUlEe and reNm air dnmpers to O�ovide 100 percen� o! lha tleslgn supply <br />air es outside ai� m reduca ar eliminale l�v naed lor mee�anlcal cooling. <br />Water oconamBeu z�all bv caP�01e ol p�ovidinp Ne lotai concurrent <br />coolin9 �oad sarved by lhe conneted terminal equipmentlacking alrsiCe <br />econamixer, at outsiEe alr temperalwes ot AS°F dry�bulb/A0`F webbulb <br />and belaw For Ihis calculatiaq all laclorc including solar antl inlarmi load <br />s�all be t�e same as t�ose usetl lar peak laatl calculalions, except tor the <br />ouisitle tempa�aiu�os. <br />Exceptlon: W eter economliers usin9 alo-cooletl �eat releclion <br />equipment may use a 75°F dry•bulb outside eir lempnreWm br <br />ihis caleulotian. T�is exception is IimiteE to a manimum ol 20 tans <br />pm builtlinp. <br />t<1].2 Documentation: Wator economiier pbns submitted tar appmval <br />shall inclutlo Ihe �ollowin9 ���otmalion: <br />1. Marimumautsideairmndilionslorwhkheconomizeriesizedto <br />p�ovide lull caolinq. <br />]. Dosign cooling load lo be provided hy ecanomixer et ihi� oulaiEv <br />air condi�ion. <br />3. Hoetrryeclionandlormiwlepuipmnntperformancadata <br />inclueinp moEel number. Ilow ratv, capaeiry, enlotlnp antl Ieavinp <br />�emporaW ra in lull economlzar toolinp made. <br />74f 3.31nteBrateO Operatlon: Alr economizers shall be capa0le af <br />pmvidinB partial caolin9 even when atldilionel mac�anicel coaling is <br />requimd lo meotlhe mmaindar al lhe toalin0 �oad. <br />Ezeeptlons: <br />i. Intlivqual, Eimcl e�pansion unib Ihal have o ratetl capaci�y <br />Ivss Ihan 65,000 BtWh antl uze nonlnlegntetl ecanomizer <br />conlrols Ihal preclutle simultaneoun opeia�ian ul lhe <br />eronomixet antl mec�anical coolinp. <br />4. Watencooletl wale� chillers wilh watnaiEe economizm. <br />f47J.4 HumICl/icatlon: It an oir economizer is roqulred an a cooling <br />system lor w�ich �umitlificalion equipmenl is to be pw�ideE lo maintain <br />miNmum Intloor humidity lovelc, I�en ihs �umi0ilior c�all ba ol ihe <br />atliaEatic type (dlmc� evapamlrve meEia ot log atam¢alion lype). <br />Exceptlons: <br />7. HeaIN caro lacilitiea whem WAC 246�320�575 allows only <br />steam injeclion humidiiius In tluctwark tlawns�rcam ol l�inal <br />lillers. 7412.6 Combustion HeaUnp EquipmenlConlwls: <br />Cambustian �ealing equipmenlwi�h a capaciry over 225,00� <br />Btulh shall havc motlulating a� s�aged combustion caNml. <br />2 SySiemswi��walerecanomixer <br />3. t00X autsiEa air syslemswith no pmvlslonslor air <br />mcirculalion lo Nc cenirel supply lan. <br />4. Nonadiabatic humidllierc cumulatively servin9 no more than <br />70% ol o EuiltlinB's an acenemilet capaciry as measored in <br />cim. Thls rcfine lo Ne syslem clm servinB �ooms wii� sbnC <br />alono or ducl mountetl �umitlilie�s. <br />1474 Duetlnp Systams <br />1419d Sealln0� Oucl wark whi<h is Cesl9�ed ta operale at prossures <br />ebove 121nc� watar calumn slaUc pmssum shall be aealetl in accordance <br />wlth5tantlatdRS4B. EHtenlofsealin8«9uimCi�nslollows: <br />1. Slatic pressum: 12 inc� l0 2lnchas; cealUenevatsa lointz. <br />Y. Slalie prcssum: 4 inches m 3 inches; seal o0lnnsverse jainK <br />•�tl lanpifutlinal seamz. <br />3. Staticpressure' abaveJinches;sealallUansvene�oln[s, <br />IOfIBRY410i� 60if1:6 dpd tlYCI Wd�� P0118�lpIi0f16. <br />Oucl tupe anE olher prcssura sensitiw tape ehall nol be uaed a s tba <br />primary sealant w�em ducts am desiBnaE lo aperate at abGe P�essurcc ol <br />1 inch W.C. or gieater. <br />1414.Y Ineuiatlon: OucK antl pienums Ihalam consbucie0 and lunclion <br />as part of ��e CuildinB envelope. by se0arating inle�ior space Irom ezteria� <br />epoce, chall meet all applica�le requi�emenls oi C�apter 19. Thesa <br />�aquimmenh incluEe insublion installation, moishm conlml, aiNoakaBo, <br />ond buil!in0 envebpa insulalion levels. Unhaatetl eQuipmenlrooma w�th <br />r,omhusiion atr lowcre muzt be isolateC Imm ine canEi�ionetl space Oy <br />insulating inte�ior sunc�os lo a miaimum ol R�11 and any oxia�ior <br />envvlape sutlaces per Chapter 13. Outsidc air tlucts serving inElvltlual <br />supply alr unita wM1h less t�an 3,800 cim ol btal supPly al� capacity shall Eo <br />insulated to o minimvm ol R4 antl am nol connHemd builEinp envelape. <br />Olheroutsida airduct runn em consiCered builtlin0 onvelape until Ney, <br />7, conneclto t�e �ealinp o� caa6n0 eQuipment, o� <br />2. a�c isolated Imm Iha avteriorwilh an automatie sAubalt tlamper <br />complying wilh Seclion 1412A.1. <br />Once outaitle airtluc6 mevtNe a0ove '!ed mquimmenB, ony mns <br />wilhin canditianed space sAall camplywilh' �e 19S requircmenls. <br />Ol�er ducts and plenums shall be thermairy Insulated per Tabla 14-5. <br />Ezcaptlons: <br />1. Wdhin lhe HVAC equi0menl. <br />2. ExnauslairtlucKna[aubJecltown0enae[ion. <br />J. GMpoaetlOuclworkwithinaionelhalserveelhat2ane. <br />7413 Plpinp Systnms <br />1415.1 Insulatlon: Piping shall0e �humally insulated in accordancc with <br />raeio �a-a. <br />Ezccptlon: Pipinq meblletl within unitary HVAG eyuipmenl. <br />Wole� pipos oulside I�e contlitionetl apace �hall Ee IncubleE i0 <br />acco�danro witb Washin9�on Stale Plumbing Cotle (WAC 51-]8) <br />7416 Completion ftequlrcments (Reler foNREC Secl'an 7416 antl the <br />BuilEinO �ommisaanin0 Guidelinea, Ou6liaheC by Ne BuiMinp <br />Commuaionin0 A�sociofian, lor compble lert ond O�belinex !oi builtling <br />compklion enC rommisaioninA /�9���amenlsJ <br />I�G � <br />0 <br />