Laserfiche WebLink
d' <br />ra� nEVE�.orM� <br />P.O. 60X 28404 Scatlic, WA 981 t8 <br />Meg M. Haley <br />Plans Examiner <br />City of Everett <br />Subject: <br />Dear Meg: <br />Response to the Building Pertnit Plan Review For lhe pu <br />607 SE Gverett Mall Way <br />(Plan Review No. B0604-047) <br />(Z06) <br />in response to your review comments made in May 15, 2006, az�d I am providing the following: <br />1. <br />2. <br />3. <br />4. <br />5. <br />ti. <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />Clarified the difTcrentia from ncw construction and existing construction, including the meds toilet <br />room, and the multi-tenant egress (see sheet A 1, Ploor Plan Layout). <br />Specified the fire separation wall not remove and noted as a one-hour wall on the plan (see sheet A I, <br />Ploor Plan Layout). <br />Noted lhe exit corridor should be a one-hour rated cortidor (see sheet A l, Floor Plan Layout). <br />Revised the swinging doors into Uie egress corridor should s�ving in ihe direction of egress (see sheet <br />A1, Floar Plan Layaut). <br />Provided the area of glazing, door and opening sizes, design, and hardware set. The note of panic <br />hardwarc requirement had been removed (see shect A2, Door Schedule and Equipment Layout Plan). <br />Provided a window elevation and identified the safety glazing for all windows (see sheet A 1, �loor <br />Plan Layout and Sheet A2, Window Elevation). <br />Indicated the ceiling heights on the re(lected ceiling plan (see the note on sheet A I, Ceiling Plan). <br />Identified the two means oTegress from cach space on eithcr side of the one hour fire separation wall <br />(see sheet A2, Equipment Layout Plan). <br />Clnrified the exit signs for both dining area and submitted a door schedule (see sheet A2). <br />Clarified the exit to corridor for another tenant (see sheet A I, Floor Plan Layout). <br />Included the north arrow on the drawings (see sheet Al and A2). <br />Provided the emergency lighting on outside of the egress doors (see sheet A2, Equipment Layout Plan <br />and note). <br />No modification in toilet rooms. <br />No revisions are made to the men's toilet room. <br />Provided the manufacturer's item number and detail of the bufTet tables for review (see attachment, <br />sheet 1 und 2). <br />Clazified the lavatory in the men's toilet room. <br />Showed the water heater in the kitchen (see sheet A2, Equipment Layout Plan). <br />Attached you will find two sets of revised with Ihe above required revisions and two sheets of buffet table info. <br />We hope that ihis meets your needs. Please call if you have any questions or comments. <br />Sincerely! <br />� <br />�����----- <br />(206)22 -5658 <br />cvn\corrccli onresponsns\mcg-cvcret t �2 J <br />