My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
620 SE EVERETT MALL WAY AUTHENTIC ASIAN AMERICAN BUFFET 2016-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
620
>
AUTHENTIC ASIAN AMERICAN BUFFET
>
620 SE EVERETT MALL WAY AUTHENTIC ASIAN AMERICAN BUFFET 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 3:49:19 PM
Creation date
2/13/2017 8:40:47 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
620
Tenant Name
AUTHENTIC ASIAN AMERICAN BUFFET
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.. <br />RESPONSES TO THE PLAN REVIEW COMMENT <br />Jun 16,2010 <br />Ms. Meg Haley <br />Public Works Department <br />City of Everett, WA <br />Project: 10' type I hood, AAA Buffet Restaurant <br />620 Everett Mall Way, Everett, WA 98208 <br />Dear Ms. Meg Haley: <br />Thank you for your detailed review and suggestions. The following <br />are our responses to your plan review comments in the order of the comment. <br />#1: Added a roof access with a fixed ladder on plan. Please see <br />section A& B for details. <br />#2. added 2x4 frame, 3�4 � plywood sheathing and touchdo�vn roofing <br />with'/�" :12" sloped platforn� wiqiin the screen �vall around the exhaust f'an. <br />#3, attached a structural engineer calculation. <br />#4, specified on plan detail A& B. <br />#5, same as #4, <br />#6, Please the 3M fire wrap specifications attached with this letter. <br />#7. this specific mezzanine storage will be occupied all by this hood <br />duct and make up fan. The existing door will be closed and locked. So the <br />duct wrap will be protected. <br />#8. showed and noted on plan M1 detail plan B. <br />1fJ. showed and on MI det��il plan B. <br />#10, specifiecl on plan notes on M2, under the CFM calculations. (On <br />A41 previously) <br />#11, the hood suppression system will have a separate permit <br />application �vith plan Uy certified contractor. <br />Should you have any other questions and concern, please call me any time <br />on my cell phone 206-817-6081. or email to me at david6081(�a �mail.com. <br />Sincerely yow's, <br />David Lee <br />Techcraft corp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.