My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
802 SE EVERETT MALL WAY EVERGREEN BEAUTY AND BARBER COLLEGE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
802
>
EVERGREEN BEAUTY AND BARBER COLLEGE
>
802 SE EVERETT MALL WAY EVERGREEN BEAUTY AND BARBER COLLEGE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 9:59:45 AM
Creation date
2/13/2017 8:47:05 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
802
Tenant Name
EVERGREEN BEAUTY AND BARBER COLLEGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG OS-02-2�05(iHU7 ll:04 <br />i�i.l-I. REG-). 001411 <br />CT 1 <br />F'EF'MIT �!o.50F,004 <br />1 F/C a�'?.94 <br />Ev ErT iL �8L7_'=��'+ <br />(425) 257-8810 ICHEK $9�7.'i�i <br />Plan Check No.: <br />Application Date: <br />Tenant: <br />Owner: <br />Job Address: <br />Proposed Use: <br />Description of Work: <br />Plan Check Fee Paid: <br />80506-004 <br />O6/02/2005 <br />EVERGREEN BARBER & BEAUTY COLL <br />PENTA CAPITAL LLC <br />802 SE EVERETT MALL WAY #7 <br />RETAIL <br />T.I. ADD MEZZ FOR B& B COLLEGE <br />$827.94 <br />The building pernut application fo.• tHe abeve•reCereneed projec[ is being conditionally aceepied for Gling <br />pending tlie deterniination oCits co�ipleteness. <br />if tlie City review determine� rhar any additional land use approval or any additional infomiation is <br />required to complete your building permit application, it will be necessary to submit tUis additional <br />information or acquire tUe additional land use approval prior to yow application beina considered complate <br />for filing. If no other land use approval or additional in(ormation is required, your building permit <br />application will be cansidcred tled as of this date. <br />BUILDING PERMIT APPLICATIONS EXPIRE iF NO PERMIT IS lSSUED <br />WITHIN 180 DAYS FOLLOWIN('a THE DATE OF APPLICATfON. <br />C-�, �'�1 �- N �---� <br />Signa;ure <br />, <br />oGio �-l�5 <br />Dac� <br />FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.