Laserfiche WebLink
. 2006 Washinglon Sta�e <br />ProjectInfo <br />Stale Nonresidential Energy Code <br />Dollar Tree at Evarett Nall <br />6varatt, MA <br />Dollar Tree <br />Project Description 2 x New 5 Ton Gas Roof Top Units <br />BrieFlydescribemechanical 2 x New 7.5 Ton Gas RoofTop Unit <br />system q�pe and tealures. <br />Date <br />❑ Indudes Plans Include documentation requiring compliance wilh commissioning requirements, Sedion 7416. <br />Q Simple Syslem Q Complex System Q Systems Analysis <br />Compliance Option �See Decision Flowchart (over) for qualifications Use separale MECH-SUM for simple & complex systems.) <br />Equipment Sehedules The tollowing information is required to be incorporeled with the mechanical equipment schedules on lhe <br />plans. For projects without plans, fill in the required infortnalion below. <br />Coolin E ui ment Schedule <br />Capaci OSA CFM SEER <br />Equip. � � Total CFM or Ewno7 or EER IPLV� Lowlion <br />ID B�and Name� Model No. Btu/h <br />aeecsoe <br />59750 2000 Econo 15.2U - <br />92140 3000 Econo 12.00 - <br />59750 2000 Econo 15.20 - <br />92140 3000 Econo 12.00 - <br />Equip. �.apaury a <br />ID Brand Name� Model No.� BW/h Tolal CFM or Econo7 Input Btub Output Btuh ERcien <br />rro-1 GRAIER aeeceofi 115000 2000 Econo 115000.00 93000.00 82.000 <br />ixu-2 cnxxisn aeaceoe 180000 3G00 Econo 180000.00 148000.n0 82.000 <br />rjv-3 c�aaleR aexceo6 i15000 2000 Econo 115000.00 93000.00 82.000 <br />,,,._. �.oe.�o aeeceae 1H0000 's000 Econc 180000.00 148000.00 82.000 <br />Schedule <br />Equip. <br />ID <br />odel No � I CFM I SP' I HP/BHP IFlow Control�l Location of Service <br />GN-320 2UU .25�' U.1% va IToilet Room <br />�If available. ' As tested acwrding to Table 14•1A through 14-1G. ' If required. ' COP, hSPF, Combuslion Efficiency, or AFUE, as <br />applicable. 5 Flow conlroi types: variable air volume(VA�, constanl volume (C�, or variable speed (VS). � <br />6 <br />{� G <br />