Laserfiche WebLink
MiGi¢eUon <br />Construction ot the w�est drivewny to ils ultimnte coufiK��rntion will nllo�v q�,���1 <br />identificatfon and acceesibility for theatcr traffic. <br />NEW OFFICE BUILUING llF.VELOPMENT <br />7,r� <br />Depending on the eize of building, the offiues will ¢dd Crom lAG Lo 350 <br />vehicles to the area's afternoon penk hour traffic. <br />FiSures 5, fi and 7 ahow the �otA1 uroiect (200,000 equere foot, oftice plus <br />theater) traffic assiqned to the etreet eyetem [or 6he AM penk� PM pexk nnd <br />average week day reapecLively. Figure 8 shows the exisLinq dnily trnffic and <br />the eslimated 1995 trnf[ic both with and without the project. RxteLing daily <br />volumes were estimated aesuming thnt Che peak hour ie 10 percent of the daily <br />volume. <br />Lalkitls <br />The current si[e plan� echeme N-F, shows 1335 sur[ace parking epaces. This <br />in enough to aupyort the code rcyuiremenLs Cor thc eaisdng 236,ODU equnre <br />feet o[ of[ice epace� the propoeed thenter, and an additionnl 130,OOU office <br />6uildinB. Conetruction oC a 200,UUU equare foot oftice building would require <br />u pnrking gerage to provide nn additional 175 epaces over that shown. <br />I.EVEL OF SERVICE <br />I.evel ot service cnlculations were performed to nnnlyze the traf[ic impacts of <br />the total project (200,000 office building nnd the theater) on the street <br />sysLem. <br />'I'Le level of service has been calculnted using recent traffic counts eupplied <br />by Lhe City of Everett� co�mts taken epecitically for Lhie project� and <br />informntion contained in the West Mall Village traftic projecttons. 1'Fa <br />r.xisting lrnttic wan increased by 2.E percent per yenr to obtain year 1995 <br />vulumeF. Appendix A contains n summary of the traffic couttt projections. <br />I,evele of eervice were culculnLed wiLh and without projecL generated traffic <br />during 6he p.m. penk hour for the 1995 horizon Yenr. 7'he LOS calculatione <br />were performed uxing Lhe meLhodoloby of Lhe 1985 Ilighway Cnpacity Dlnnual <br />wiLh Lhe NCAP r,omputer progrnm developed by a diviRion ot Metro <br />Trnnsportation Group, Inc. A 105 second cycle IengLh� pr.nk hour Cuctor o[ <br />0.95, nnd Sood progreasion along Everelt Mall Way were asaumed. The level af <br />�;ervice at Lhe Broadwny intersecLions with SR 526 and with Ueverly Boulevard <br />werr. nnnlyzed using the 7'RC Circulur 212 procedure recently ndopted Cor use <br />by Lhr. Cil.y of IiveretL. <br />