My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
830 SE EVERETT MALL WAY 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
830
>
830 SE EVERETT MALL WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:04:16 PM
Creation date
2/13/2017 8:50:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERTEET ENGINEERING <br />Clvil end Trensportetion Consullenls <br />2924 Colby Avenue <br />Evereu, WA 98201 <br />March 4, 199D <br />Ken Howe, P.E. <br />City of Everett <br />Department of Public Worke <br />3200 Cedar StreeL <br />Everelt, WA 98201 <br />De¢r Ken: <br />(206)252•7233 <br />Attached are revised pages 3, 6, 7 and 8 of the EMOP IV revised trafCic impact <br />analyais dated February 19, 1990. Aleo included are revised copiea of the <br />cumulative tra[fic volume spreadsheets. <br />On pnge 3, I have added the sentence "Excepl for tripe bound toward the <br />Stiver Lnke area� sll new trips were routed out of the eite via the proposed <br />new sign¢lized driveway." � I believe that tl�e new signal will attract moet of <br />the new (¢nd existinE) office pnrk tratfic. Of course, some traffic may uae <br />the southwest eait, travel to 7th, head south on 7th to 112th, ¢nd then uae <br />112th to access 4th Avenue, but tha[ is impossible to predict. 7'hat routing is <br />circuitous and 7th ie currently an undesirable atreet to drive. Everett Mall <br />Way ie a high capacity� high speed facility with escellent signal progreesion <br />and offers a superior route for those vehicles to follow. <br />On the botLom of pa@e 6� I completed the last parngr¢ph by adding the <br />senlence "Project trn[fic represents 1.36 percent of the predicted 1995 totnl <br />Lrnffic volume at the intersection.° The overflow cnused be ¢dding this <br />senlence impucted puges 7 and 8 so they were reprinted. <br />The cumulntive traftic volume spreadshce[s are revieed to acc,�rately reflect <br />the revised routing and trai[ic volumes trom Lhe site. I also sdded the <br />Broudway / SR 526 intersect.ion Lo the listing. <br />Far the f3rondwny / SR 626 inLersection pLjy, i used the A% growth factor <br />recenLly adopted by the City, and I included ull of the SEPA Projects 1've <br />recerdly tollowed as p¢rt of the Merrill Craek Centre ¢nalysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.