Laserfiche WebLink
N <br />December 27, 19f19 <br />Mr. Tim Tyler <br />Building Department <br />CITY OF EVERETT <br />�200 Cedar Street <br />Everett, Washington 48201 HAND DELIVERED <br />Re: Everett Mall Office Park Phase IV/Act III Theatre <br />Dear Tim: <br />Enclosed please find the following which c�uqment the bui2ding plans <br />previously submitted: � <br />1. civil drawings <br />2. i,andscape drawings <br />3. Supplemental ir.formation to SEPA Checklist (includinq traffic and <br />other related information). <br />4. Master Site Plan showinq phasinq <br />The original of the supplemental information on the Environmental <br />Review Checklist is simultaneously being delivered to the PlanninR <br />Department. The checklist for this project and adjacent property wa:: <br />previously submitted and reviewed in con�unction with a heig!it <br />variance that was approved by word of adjustment last year. A <br />demolition permit has been issued with rork now underway. Yor- <br />cooperation in processinq this material and related building permit <br />applications is sincerely appreciated. If there are comments or <br />questions please do not hesitate to contact Bud Carlisle or myself. <br />Best regards, <br />HARMON A& S OCIATES REAL ESTATE� INC. <br />C�. � <br />rry Wi ngraham <br />Presid�nt <br />� <br />LWI:csw <br />Enclosures <br />cc: Bob Landles (w/ enclosures) <br />Mary Cunningham (w/ enclosures) <br />Mark Wolken <br />Hud Carlisle <br />Ron Gregory <br />Our file nu�ber 2404AC* <br />122G89/F/C362/crosw <br />I.�nnu�xvl Coiry�iam Ccni<c IVJIII i1M1h ,ha. W i.t Suim IfMI. I.�nnx�nYl, ll'mhingu��Wlk.—, <br />It0- Ilo� OiL4. I-)nnxwxl. \CadiinF���n 9t01MM17�v Trlephone I�IMJ ]'l I.WI]0 P X Q(N�17).� I'l l,y! <br />