Laserfiche WebLink
� <br />February 16, 1988 <br />ibn Rubatino <br />MacDonald McLaren Pssoc. Inc. <br />Con3ulting Engineers <br />820 John St. <br />Seattle, WA 98109 <br />RE: Everett Ma}1 Office Park Phase III <br />906 SE Everett Mall Way <br />BP: 18188-19118 <br />Dear Mr. Rubatino: <br />, _ -:r <br />iin or <br />everett <br />w.;�u. �.�r,<;s oea:arrnerir <br />]:IOCE�APSTPEET <br />EVEFETT. WASHINGTON <br />9820t <br />Enclosed are the following special inspection reports that note irregularities, <br />which are highlighted: <br />Boss Testing reports dated - 12-7.8-87, 1-4-E8, 1-15-88, 1-16-88, 1-21-E8, <br />and 1-28-88. <br />MacDonald h±cLaren Assoc. reports dated - 12-5-67, 12-24-87, 1-4-88, <br />1-5-88, and 1-6-88. <br />Ylease inform us as to your recommended corrective action in each case so <br />that this can be reviewe3 by this Department and the Special Inspection ntaf£ <br />can proceed with full knowledge of the approved design. <br />As you may know the testi.ng laboratory must submit a final report regarding <br />the conformance of the project and the resolution o£ these issues will affect <br />that report. <br />If you have any questions please call this effice at 259-8810. <br />We do appreciate your a�sistance in this matter. <br />Sincerely, <br />AT.FRED R. THEAL. P.E. <br />Directo of Public Works <br />i <br />� y�1 L Y� �� <br />By: Tim Tyler <br />Building Official <br />cc: Ted Budden <br />Boss Testing <br />TT%sh <br />AiPEETS AEAIPROCERTY/ TBANSIT MOTOR B111L0�rvG PU9LIC UiILIilES COtlSTRUL11011 EIIGINEEP��IG TfiAFFICENGRI <br />:`.9�8820 LIDI; 2'_9�8BOJ VEHi0.E5 259�B8W SERV�LES 253�9900 U�SPECTiON 255�tlB�0 SiGt�AL1AAiNtFNANCE <br />.'S9�Bu00 259�28�: 259�tlB00 WaierSower 254Btl00 259�dC00 <br />ominone <br />