Laserfiche WebLink
N <br />IV. Asohalt Pavine: <br />1. Asphalt pavement <br />Summarv <br />I. �torm Drainage System <br />II. Sanitary Sewer System <br />III. Water System <br />IV. Asphalt Paving <br />2394.13 <br />6,172 S.Y. <br />SUB TOTAL; <br />GRAND TOTAL: <br />-2- <br />$ 7.00/S.Y. $43.204.00 <br />$43T29Er'0� <br />$10;114.00 <br />$ 6,916.00 <br />$26,912.00 <br />�4'.'�Z04 • 00 <br />$8�-3�tG:'�S d <br />U�� <br />� � ��2 <br />