My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
909
>
BASE FILE
>
909 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 7:43:49 AM
Creation date
2/13/2017 8:56:23 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
909
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 21, 1979 <br />Mr. Roger Mebust � <br />H. M. and Company, In . P. �. 1_ <br />1101 Pike-Street � <br />Seattle, Washingto 98101 / <br />Re�Diagonal Way Business Park <br />i <br />Dear ML• M�t:�'' <br />�� <br />..�.. � .�i:CITYOF <br />everett <br />QTY NALL . 3p0.111l5 <br />cvcnerr. wena��crc�i <br />vx¢m <br />It is the intent of tl�e City of Everett to issue a revocable conditional <br />Construction Permit for the above referenced project on Monday, <br />November 26, 1979. <br />Issuance of this co:�ditional permit is predicated on receipt of an <br />executed acceptable ucility easement. No permit can be issued prior <br />to our receipt of this d�cument. <br />•iite face of the permit taill be marked as follows: <br />NO WORK WILL COP4MENCE ON THIS SITE PRIOR TO ISSUANCE OF A <br />RIGFIT-OF-WAY (PUBLIC WORKS) USE PERMIT. <br />The remaining Public Works requirements are of a technical rather than <br />substantive nature. Review and approval should be possibLe within <br />24 hours after receipt of your corrected plans reflecting the required <br />changes or modifications. Upon issuance of the Right-Of-Way Permit, <br />you will be issued a standard Construction Permit. <br />I wish to stress that, should site work commence prior to issuance of <br />the requirecl permit, the conditional construction permit will be <br />revoked and a Stop Work Order issued. <br />We wish to fully cooperate in expediting your project through to final <br />occupancy. If, for some reason, your Public i4orks approval is delayed <br />beyond an acceptable start date for site work, please contact me to <br />explore possible alternatives. <br />� <br />.' , ;! ' I;I <br />sincerely, � L ��: , , ; - ''s <br />J�,<�:;�C•7��,'r,() <br />O. Patzold� ''"`� � � ���� <br />Construction Permit Coordinator ,, <br />,_� I <br />vPublic Worlcs Uap[. <br />
The URL can be used to link to this page
Your browser does not support the video tag.