Laserfiche WebLink
Paul McKee <br />From: Ken Lee [KenL@brhinc.com] <br />Sent: Friday, November 12, 2004 8:07 AM <br />To: 'PMckee@ci.everett.wa.us' <br />Subject: 910 SE Everett Mall Way <br />L& <br />FlreAssembry.pdf <br />Hi Paul, <br />I am still working on the changes for the Everett Retail Building. As I <br />have been working though the issues, I have come up with some question <br />regarding domestic water and the fire sprinkler room. <br />+Why does the existing water supply from Everett Mall Way need to be <br />abandoned from Bigfoot Java to the new building? We were hoping to utilize <br />the existing water meter. <br />+For the DCDA situation, we are leaning towards leaving the sprinkler room <br />as is and having the DCDA be located in a vault. With that, does the vault <br />need to be in landscaping or can we locate it in the parking area/asphalt? <br />In addition, does the Post Indicator Valve need to be in a certain location? <br />The FDC is shown as before with no comment from the city. It is located in <br />the landscape area and I assume it to be Ok. The Everett Engineering <br />Standards only show the DCVA. I have attached an example of a Renton <br />engineering spec. that shows what I am getting at. <br />+What Utility Vault model/size does the DCDA vault need to be? The <br />standards does not give a size or dimensions. <br />Thanks, <br />Ken <br />t <br />OP <br />