My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
910 SE EVERETT MALL WAY DAIRY QUEEN 2016-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
910
>
DAIRY QUEEN
>
910 SE EVERETT MALL WAY DAIRY QUEEN 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 6:41:29 AM
Creation date
2/13/2017 9:04:36 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
910
Tenant Name
DAIRY QUEEN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kegel & Associates Inc. <br />I•iarch 20, 1981 <br />Planning Department <br />City of Everett <br />City Hall <br />Everett, 4lashington 98201 <br />Attn: Bob Landles, Environmental Coordinator <br />Re: 2.97 Acres -- South Broadway Cutoff <br />Hillis Homes, Inc. Profit Sharing Trust <br />Our Job tVo. 8238 <br />Dear Sir: <br />Pursuant to our meeting of March 19th, we herewith forViard for your <br />review and approval the following: <br />-- �50.00 Check <br />-- Environmental Checklist <br />-- Legal Description of Property <br />-- Clearing, Grading and Excavation Application <br />-- Grading & TESCP Draa�ing (5 sets) <br />-- Site Plan for Restaurant (5 copies) <br />As we discussed, it is the intent of our client to obtain clearing and <br />grading permits for the entire site as soon as possible; then proceed <br />�•iith preparation of the front 0.75 acres for construction of the above <br />mentioned restaurant, There are no definite plans at this time for the <br />rear portion of the property, however development in the near future <br />will be in accordance �aith the existing C-1 zoning. <br />4!e have investigated the existing drainage basin, which drains south <br />through the so-iale on the �•�est 25 ft. of the parcel, and have designed <br />an enclosed system to convey storm water across the site. Subsequent <br />to our meeting scheduled for 10:30 a.m., Wednesday, t�tarch 25th to <br />discuss your response to the enclosed submittal, o-ie will submit the <br />drainage plans as required. <br />If you have any questions, please contact our office. <br />Respectfully submitted, <br />�. ' %��� <br />R. t4ichael Spano, P._. <br />Kegel & Associates, Inc. <br />cc: Ed Heavey ENGINEERS • SURVEYORS • PLANNERS <br />9800 EVER GREEN WAV IU.S.991, EVERETT, lNASHING70� 98204 • PHONE 120�1 353�7759/ 775�5c24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.