Laserfiche WebLink
� <br />f_ <br />CKGROUND <br />The site of the proposed temporary Frontier Bank facilities is an 0. GO <br />acre parcel abuttiny the south side of Everett Mall LYay approximately one-quarter <br />mile east of 77th Avenue S.E. in the City of Everett, LYashington. (See Vicinity <br />Map attached as Exhibit 'A'. ) It is covered entirely by a well compacted gravelly <br />fill material, sloping gently in a southerly direction at roughly 2.5 - 30. The <br />proposed development on the site will not significantly increase discharge of <br />stormwater runoff along the south line--a conservative judgement would be an <br />increase in the 'C' factor from a pre-development figure of 0. 6 or 0. 7 to abeut <br />0.85 following development. <br />PROPOSAL <br />The proposal to collect and disperse stormwater runoff following comple- <br />tion of construction activities is to construct a 2' deep x 18" wide dispersal <br />trench along the south property line. Runoff will be directed towards the south <br />line by grading patterns and released into the dispersal trench by 7" � drainage <br />(or weep) holes in the extruded concrete curbinq at 18" on centers. 'The top of <br />the trench will be constructed 6" below finished grade and an emergency overflow <br />will be provided alonq the south line to allow potential stormwater overflow to <br />travel in sheet flow in its natural southerly direction. <br />7 <br />►! <br />� <br />