My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/27 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 11:39:38 AM
Creation date
2/13/2017 11:37:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 7 <br /> PROJECT TITLE: <br /> Award of Contract for the Consent COUNCIL BILL <br /> Construction of the Water X Action Originating Department PW/Utilities ' )// <br /> Main Replacement "H"Project First Reading Contact Person Jenifer Galatas \ <br /> Second Reading Phone Number 257-7215 <br /> Third Reading FOR AGENDA OF July 27, 2005 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Preceding Action Attachments Department(s) Approval <br /> Smith Island (See Authorization to Call for Project Location Map Legal <br /> Attached Map) Bids, June 15, 2005 Bid Tabulation <br /> Amount Budgeted $600,000.00 <br /> Expenditure Required $560,928.77 Account Number(s): UP 3220 <br /> Budget Remaining $37,07113 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Water Main Replacement "H"project will replace approximately 5,200 linear feet of 6 and 10 inch <br /> deteriorated asbestos cement and cast iron water mains with approximately 2,600 linear feet of new 12 inch <br /> HDPE water main. The replacement of these mains will provide increased reliability of the system. <br /> Six bids were received at the bid opening on July 12, 2005 and DDJ Construction Company, Inc. was the <br /> lowest responsive bidder with a bid of$516,509.00 bid for the work and $45,452.79 of sales tax for a total of <br /> $561,961.79. DDJ Construction Company's sales tax calculation was patently wrong and should have been <br /> $44,419.77, for a corrected total of$560,928.77. Because this is an arithmetic error that is obvious on the <br /> face of the bid, it can be corrected. <br /> Council previously approved $2,000.00 for bid advertisement expenses. The total expenditure for this <br /> account to date is $562,928.77 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Correct the obvious arithmetic error in the sales tax of the lowest bidder, DDJ Construction Company and <br /> award the Water Main Replacement "H" construction contract to the lowest responsive bidder, DDJ <br /> Construction Company, Inc. in the amount of$560,928.77 <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.