My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5352
>
Resolutions
>
Resolution 5352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 11:00:51 AM
Creation date
2/14/2017 11:00:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5352
Date
6/25/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2004 TO 2009 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Interstate Local Access <br /> 1. I-5 Median HOV Lanes &Auxiliary Lanes 1. BNSF RR track relocation (Safety) <br /> 2. I-5 /415`Street Interchange 2. BNSF RR safety improvements (Safety) <br /> 3. 3. I-5/ 112th Street SE P&R,Flyer Stop, HOV Ramps 3. Roadway hazard elimination projects(Safety) <br /> 4. I-5/Downtown Everett interchange improvements 1. Annual Street Overlay Program (Maint.) <br /> 4. I-5/ 100`h Street SE HOV access/undercrossing 2. Sidewalk repair and replacement (Maint.) <br /> 5. 6. 1-5 Snohomish Corridor Action Plan(SnoCAP) 3. Pavement marking project (Maint.) <br /> 7. I-5/Smith Island Interchange 1. 106th Place SE Improvements (Street) <br /> 8. I-5/East Marine View Drive Interchange Improvements 2. 3rd Avenue SE Improvements (Street) <br /> 3. California St. Improvements (Street) <br /> Freeways 4. Upper&Lower Ridge Rd. Improv. (Street) <br /> 1. US 2 Improvements(I-5 to SR 204) 1. Traffic Signal Interconnect (Signals) <br /> 2. Traffic Signal improvements (Signals) <br /> Principal Arterials 3. ITMS Upgrades (Signals) <br /> 1. 19th Avenue SE(SR 527) Improvements 1. Neighborhood block grants (Neigh.) <br /> 2. Evergreen Way Improvements,415`to 47th Street 2. Neighb.Traffic studies/projects (Neigh.) <br /> 3. East Marine View Drive Improvements 1. City Entryway Landscaping/Signs (Landsc.) <br /> 4. Broadway/Beverly Blvd. Intersection Improvements 1. Interurban Trail northern extension (Non-mot.) <br /> 5. Evergreen Way Improvements, 115`h St. SW to Airport 2. East Grand Pedestrian Walkway (Non-mot.) <br /> 6. Broadway Corridor Improvements 3. 10`h Street Pedestrian Improvements (Non-mot.) <br /> 7. HES Projects(Brdwy/52"d,Brdwy/Madison,Forest Pk) 4. Riverfront Walkway Overcrossing (Non-mot.) <br /> 8. Arterial Needs Study 5. Riverfront Walkway Phase 1 (Non-mot.) <br /> 6. 415`Street Bike-Ped. Connector (Non-mot.) <br /> Minor Arterials 7. 13`h Street Bike-Ped Improvements (Non-mot.) <br /> 1. 415`Street Overcrossing 8. Interurban Trail completion (Non-mot.) <br /> 2. 112`''Street SE Street Improvements (3`d Ave. SE to SR 527) 9. Terminal Avenue Ped Improvements (Non-mot.) <br /> 3. 112t Street SW/I-5 Bridge Widening 10. Henry M.Jackson Ped Bridge (Non-mot.) <br /> 4. 112`h Street SW-SE Street Improvements (I-5 to SR 527) 11. Riverside Bus.Pk.Ped Trail (Non-mot.) <br /> 5. Lowell Neighborhood Bypass 12. Port of Everett Public Access Trail (Non-mot.) <br /> 6. 116th Street SE Street Improvements 13. Snohomish River Bike/Ped Bridge (Non-mot.) <br /> 7. 100`h Street SW Street Improvements 14. Everett Non-motorized projects (Non-mot.) <br /> 7. Casino Rd./Hardeson Intersection Improvements (Various Locations in Everett) <br /> 8. 4th Avenue West Improvements (104th to 112th) Transit <br /> 9. Colby Avenue Streetscape Improvements 1. Bus Replacements-2003 to 2008 <br /> 2. Bus fleet expansion <br /> Collector Arterials 3. Regional Fare Coordination Project <br /> 1. Holly Drive Non-Motorized Improvements 4. Transit Operations &Maint.Facil. Siting Study <br /> 2. 36th Street Ped,Bike and Landscape Improvements 5.Vehicle Maintenance Capitalization <br /> 3. East Everett Avenue BNSF Overcrossing 6. Bus Cleaning Facility <br /> 4. 37`h Street Improvements 7. Paratransit Operations <br /> 5. Smith Island Bike and Pedestrian Improvements <br /> 6. Silver Lake Road- 1215`Street SE Ped Improvements HOV Projects <br /> 1. Everett Station Bicycle Demo Project <br /> 2. Everett Station Commuter Rail Improvements <br /> Projects shown in bold type were not included in 3. Everett Station Park& Ride Parking Structure <br /> The City's 2003-2008 Six Year TIP 4. North Everett Transit Center <br /> 5. Implementation of State CTR Law <br />
The URL can be used to link to this page
Your browser does not support the video tag.