Laserfiche WebLink
CITY OF EVERETT 2004 TO 2009 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAN <br /> Project PROJECT PRIO- PE j RNV CONST. Est.2004-09 LEAD MAP <br /> Number TYPE j RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> 35 Local Access-SAF 1 1BNSF RR track relocation Pacific Avenue to Lowell Junction Jan.02 Jun.02 Jun.04 6,500,000 EVERETT 31 <br /> 36 Local Access-SAF 2 BNSF RR safety improvements Various railroad crossings in Everett Jan.03 Jun.03 550,000 EVERETT <br /> 37 Local Access-SAF 3 Roadway Hazard Elimination Projects Various locations within city limits Jul.04 Sep.03 120,000 • EVERETT <br /> 38 Local Access-PR/M 1 Annual Street Overlay Program Various streets within city limits Jan.04 Jul.04 6,000,000 EVERETT <br /> 39 Local Access-PR/M 2 Sidewalk repair and replacement Various locations within city limits May.04 360,000 EVERETT <br /> 40 Local Access-PR/M 3 Pavement Marking Project Various locations within city limits Jan.04 May.04 210,000 EVERETT <br /> 41 Local Access-STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Sep.04 Jun.05 650,000 * EVERETT 32 <br /> 42 Local Access-STR _ 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.06 Apr.07 600,000 • EVERETT 33 <br /> 43 Local Access-STR 3 California Street Improvements Virginia Avenue to Maple Street Jul.07 May.08 580,000 * EVERETT 34 <br /> 44 Local Access-STR 4 !Upper&Lower Ridge Rd.str.improv. 74th Street to 78th Street Aug.07 Jan.08 Jun.08 300,000 ' EVERETT 35 <br /> 45 Local Access-SIG 1 !Traffic Signal Interconnect Various locations within city limits May.04 240,000 EVERETT <br /> 46 Local Access-SIG 2 Traffic Signal Improvements Various locations within city limits Jan.04 Jun.04 900,000 EVERETT <br /> 47 Local Access-SIG 3 ITMS Upgrades Various signals in Everett Jan.05 Apr.06 1,600,000 * EVERETT <br /> 48 Local Access-NEI 1 Neighborhood Block Grants Various locations within city limits Jan.04 May.04 360,000 * EVERETT <br /> 49 Local Access-NEI 2 Neighb.Traffic Mitig.Studies&Projects Various locations within city limits Jan.04 May.04 2,400,000 * EVERETT <br /> 50 Local Access-LS 1 City Entryway Landscaping and Signs Various entry corridors into the City IMar.04 Jul.04 150,000 • EVERETT <br /> 51 Local Access-NM 1 Interurban Trail,Northern extension Madison Street to 41st Street Mar.98 Jun.03 988,000 EVERETT 36 <br /> 52 Local Access-NM 2 !East Grand Pedestrian Walkway Hewitt Avenue to E.Marine View Dr. Sep.01 Jul.03 890,000 EVERETT 37 <br /> 53 Local Access-NM 3 110th Street Pedestrian Improvements Pine Street to East Marine View Drive Mar.02 Jul.03 102,000 EVERETT 38 <br /> 54 Local Access-NM 4 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Jan.99 May.04 500,000 EVERETT 15 <br /> 55 Local Access-NM 5 Riverfront Walkway Phase 1 Lenora Street to Pacific Avenue Jan.99 May.04 55,000 EVERETT 19 <br /> 56 Local Access-NM 6 41st Street Bike-Ped.Connector Interurban Trail to Riverfront Walkway Jan.02 Dec.05 1,700,000 ' EVERETT 39 <br /> 57 Local Access-NM 7 13th Street Bike-Ped Improvements W.Marine View Drive to Waterfront Sep.03 Apr.05 700,000 P.O.E. 40 <br /> 58 Local Access-NM 8 Interurban Trail Completion 44th Street to 41st Street Mar.03 Jan.04 Jun.05 200,000 ' EVERETT 41 <br /> 59 Local Access-NM 9 Terminal Ave.Ped.Improvements California Street to Bond Street Jun.02 Aug.04 110,000 ' P.O.E. 42 <br /> 60 Local Access-NM 10 Henry Jackson Park Ped Bridge E.Marine View Drive to Riverside Bus.Park Jan.04 May.05 Jul.06 2,700,000• EVERETT 43 <br /> 61 Local Access-NM 11 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.05 Apr.06 500,000 • EVERETT 44 <br /> 62 Local Access-NM 12 Port of Everett Public Access Wlkwy. Bond Street to Pigeon Creek No.1 Jun.04 Jun.05 200,000 * POE 45 <br /> 63 Local Access-NM 13 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Smith Island Nov.01 Apr.09 - 9,000,000 * EVERETT 46 <br /> 64 Local Access-NM 14 Everett Non-Motorized Projects** Various locations within city limits May.04 , Sep.05 600,000 ' EVERETT <br /> ••Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 39,765,000 <br /> Bond Street,Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW, <br /> 93rd Street SW,Dorn Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,Cady Road, <br /> 1 Fleming Street,75th Street,100th Street SW,and various shoreline public access projects <br /> *A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2003-2008 Six-Year TIP. <br /> Local Access Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement; <br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement <br />