Laserfiche WebLink
EXHIBIT A <br /> AMENDEMENT NO. 1 <br /> SCOPE OF WORK <br /> PROFESSIONAL SERVICES SCOPE <br /> The scope of services for Amendment No. 1 for the Service Center Redevelopment Project shall include <br /> GC/CM Approval Process,Master Plan Revisions, Initial Schematic Design,and Design Options <br /> GC/CM APPROVAL PROCESS <br /> Provide the following work to take the GC/CM form initial conception through completion of the Request <br /> for Proposals. <br /> 1. Attend additional meetings as required <br /> 2. Coordinate the City of Everett GC/CM Consultant—Michael E. Purdy Associates,LLC <br /> 3. Provide project information and graphics as required for State of Washington—Capital Project <br /> Advisory Review Board(CPARB)Application <br /> 4. Provide project information and graphics as required for Project Review Committee—Oral <br /> Presentation <br /> 5. Attend oral presentation preparation meetings as required <br /> 6. Attend Project Review Committee—Oral Presentation September 22,2016—Kent, WA <br /> 7. Coordinate project information and schedule meetings in support of the GC/CM—Request for <br /> Proposals <br /> MASTER PLAN REVISIONS <br /> 1. Attend additional meetings as required <br /> 2. Revise Master Plan to as required to reflect City comments <br /> 3. Provide an additional design charrette to review Master Plan Revisions with City Staff <br /> 4. Finalize Master Plan as required following design charrette <br /> 5. Provide Master Plan graphics as required in support of Council Briefing August 31, 2016 <br /> 6. Attend meetings as required following Council Briefing <br /> INITIAL SCHEMATIC DESIGN <br /> 1. Coordinate Schematic Design schedule of meetings with City <br /> 2. Tour Public Works facilities with design team <br /> 3. As Built existing Shop and Warehouse building areas <br /> 4. Attend and run 3 Schematic Design charrettes <br /> 5. Provide project information and initial schematic design concepts <br /> DESIGN OPTIONS <br /> 1. Attend meetings as required to review project site and design options <br /> Amendment No.1 - Compensation <br /> A breakdown of Amendment No.1 compensation is as follows: <br /> GC/CM Approval Process $ 15,637 <br /> Master Plan Revision $21,974 <br /> Initial Schematic Design $ 95,506 <br /> Amendment No.1 —Compensation $133,117 <br /> Completion of Performance <br /> Design services shall be completed by December 31,2016 <br /> Page 1 of 1 <br />