My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/03 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 9:08:17 AM
Creation date
2/15/2017 9:07:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/3/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 650. Materials Testing <br /> Objective. To provide adequate testing of materials of construction and construction site as deemed <br /> necessary to ensure compliance with current governing regulations and contract specifications. <br /> Approach. The Consultant will secure the services of a qualified Subconsultant to perform the following <br /> activities: <br /> . Inspections including soils,reinforced concrete, structural steel, aluminum dome,aluminum <br /> flat covers,welding,epoxy,and asphalt. <br /> 2. Laboratory services including soil moisture density relationship, concrete cylinder strength, <br /> non-shrink grout strength,asphalt density tests,and general cylinder pick-up service. <br /> Products. Materials testing provided by the Consultant shall be provided as necessary to ensure compliance <br /> with current governing and applicable regulations and contract specifications in accordance with the <br /> Agreement. All other materials testing will be the responsibility of the City. <br /> Page 9 <br /> P.-\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-CM\Exhibit A-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 3 i3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.