My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/10 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:14:08 AM
Creation date
2/15/2017 10:10:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br /> 13 <br /> Restoration Priorities <br /> New Salmon Subtotal <br /> Tidal Score without In City <br /> Site Habitat Acre- Total Total Technical of <br /> Restoration Sites No.' (acres) Points' Score Score' Difficulty Everett Current Status If Known' <br /> North Tip,South Ebey Snohomish County owns several hundred acres. <br /> Island 1 418 36,926 22.06 100 96 Feasibility and design work have not been started.. <br /> Owned by Port of Everett. The Port's proposed 2005- <br /> 2009 CIP calls for planning and permitting to begin in <br /> Biringer Farm 2 340 20,613 21.39 97 92 2005,with construction in 2007. <br /> Snohomish County has acquired 280 acres. A <br /> restoration plan is being developed. An application <br /> has been submitted for SRF Board funding for <br /> Mid-Smith Island 3 484 26,217 20.56 93 88 additional property acquisition. <br /> South Spencer Island Dikes are failing. Application submitted for SRF <br /> WDFW 4 297 30,288 20.28 92 81 Board funding for restoration. <br /> Currently called the Qwuloolt Estuary project. Tulalip <br /> Tribes have acquired 334 acres of property. <br /> Additional acquisition and funding are needed prior to <br /> construction.Planning is underway,and construction <br /> Poortinga Property,now could begin in 2006,if additional funds are obtained. <br /> Qwuloolt Estuary Application submitted for SRF Board funding for <br /> Project 5 355 16,750 19.83 90 84 design. <br /> SW tip South Ebey <br /> Island 6 44 1,293 17.93 81 68 <br /> Marshlands 1 7 354 20,804 17.87 81 89 X Subarea Plan to address restoration feasibility. <br /> Swan Slough 8 62 4.315 17.58 80 72 <br /> Ferry Baker Island 9 6 714 17.19 78 80 X <br /> Deadwater Slough 10 621 27,259 17.13 78 75 <br /> Simpson Lee Cat.I 11 35 2,591 16.96 77 69 X <br /> The western portion of this site was purchased by <br /> Cedar Grove and a composting facility is under <br /> construction. Cedar Grove has established a 200 foot <br /> buffer that it is enhancing to improve buffer functions. <br /> Potential restoration actions still include reconnection <br /> of tidal action to the slough and construction of a <br /> Smith Island Delta Front 12 143 8,178 16.16 73 75 X setback dike. <br /> Sunnyside North 13 182 10,774 15.56 71 66 <br /> Marshlands 2 14 476 20,884 15.45 70 76 X Subarea Plan to address restoration feasibility. <br /> Sunnyside South 15 321 19,407 15.41 70 76 <br /> Nyman Farm 16 50 6,670 15.18 69 64 <br /> So.Ebey Island,NW <br /> Corner 17 147 4,973 15.08 68 69 <br /> Langus Park#50 18 26 1,201 14.86 67 73 X <br /> So.Ebey Island,NE <br /> Corner 19 182 8,708 14.42 65 71 <br /> Snohomish County owns this property and has <br /> Diking District 6 20 225 11,804 14.29 65 60 developed a restoration plan.. <br /> N.Smith Is,Union <br /> Slough 21 13 761 14.15 64 70 X <br /> SR 529 Spencer 22 4 385 14.07 64 69 X <br /> Smith Slough,Smith <br /> Island 23 7 400 14.06 64 69 X <br /> City of Everett and US Army Corps of Engineers. <br /> Dike breach project is currently under construction. <br /> Upper Union Slough 24 82 3287 13.89 63 58 X Breach expected in 2005 <br /> South Ebey Island <br /> WDA' 25 517 32,801 12.88 58 52 <br /> Totals 5,391 318,003 <br /> 1 See Salmon Overlay Figure 4.16 <br /> 2 Mean of maximum and minimum restoration potential(IVA points per acre x salmon overlay acres) <br /> 3 This is a normalized score,where the highest score=100. <br /> 4 Much of this information comes from the Draft Snohomish River Basin Salmon Conservation Plan. <br /> 11 <br /> Section 3 General Goals,Objectives, Policies and Regulations Page 3-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.