My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/10 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:14:08 AM
Creation date
2/15/2017 10:10:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br /> 2. Private Property <br /> Summary of Restoration Opportunities <br /> a. North Spencer: Tidal restoration on Moser property on Steamboat Slough west of <br /> I-5. (Salmon Overlay Site 22 on Figures 4.15 and 4.16) Potential gain of 385 IVA <br /> acre-points. <br /> b. Smith Island: Tidal restoration of Cedar Grove/SI Investments/Kimberly <br /> Clark/Weyerhaeuser properties along Union Slough (Salmon Overlay Site 12 on <br /> Figures 4.15 and 4.16). Potential gain of 8,178 IVA acre-points identified in <br /> Salmon Overlay. Current potential gain is significantly lower due to development <br /> on a portion of the site. Restoration opportunities still include dike setbacks and <br /> restoration of tidal action to the slough. <br /> c. Smith Island: BMC West Property Tidal Restoration (Salmon Overlay Site 21 on <br /> Figures 4.14 and 4.16). Potential gain of 761 IVA acre-points. <br /> c. Smith Slough tide gate removal. (Salmon Overlay Site 23 on Figures 4.14 and <br /> 4.16). Potential gain of 400 IVA acre-points. <br /> e. Potential log storage removal enhancement on south side of Smith Island. Potential <br /> gain of 627 IVA acre-points points. <br /> Description of Individual Restoration Opportunities <br /> a. North Spencer: Tidal restoration on Moser property on Steamboat Slough west of <br /> I-5 (Salmon Overlay Site 22 on Figures 4.14 and 4.16). This site is adjacent to I-5 <br /> and SR 529, which are both on bridges next to the dike. Dikes could be breached to <br /> restore tidal action to this area. Internal dikes would be required to protect adjacent <br /> areas from flooding. Over half of the site has been filled with considerable amounts <br /> of concrete. Testing for contamination would be required. Potential gain of 385 <br /> IVA acre-points. <br /> b. Smith Island: Tidal restoration on Cedar Grove/SI Investments/Kimberly <br /> Clark/Weyerhaeuser properties along Union Slough (Salmon Overlay Site 12 on <br /> Figures 4.14 and 4.16). The Salmon Overlay identified a large potential dike breach <br /> restoration in this area. That action would have required internal dikes adjacent to <br /> the Weyerhaeuser Lagoon and the BNSF rail line. The project had a potential gain <br /> of 8,178 IVA acre-points. <br /> After publication of the Salmon Overlay, Cedar Grove obtained a permit for a <br /> composting operation on the western portion of this property. The composting <br /> project, which is currently being developed, includes restoration of a 200-foot <br /> � 7 <br /> Section 3 General Goals, Objectives, Policies and Regulations Page 3-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.