Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 7 <br /> • <br /> PROJECT TITLE: <br /> North Everett Transit Consent COUNCIL BILL# <br /> Center Project— X Action Originating Department Transportation Services <br /> Amendment No. 1 to First Reading Contact Person Paul Kaftanski/Richard <br /> Professional Services Tarry <br /> Agreement with INCA Second Reading Phone Number 425-257-8822/ 8915 <br /> Engineers,Inc Third Reading FOR AGENDA OF August 10,2005 <br /> Public Hearing <br /> Initialed by: <br /> Department Head � <br /> CAA �l Cr,-, t-(-- <br /> Council President '771 <br /> Location Preceding Action Attachments Department(s)Approval <br /> Broadway Ave. area near Council Approval Amendment No. 1 to Legal <br /> Everett Community 3/2/05 Professional Services <br /> College Budget Committee Agreement with INCA <br /> 8/2/05 Engineers,Inc <br /> Attachment A-1 Scope of <br /> Service <br /> Amount Budgeted $377,828 FT1116-NETC-650 Everett Transit <br /> Expenditure Required <br /> $134,558 <br /> (for 30%design) _ <br /> Budget Remaining <br /> (for 100 % design) $115,441 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: The study and planning phase of the North Everett Transit Center Project <br /> was scheduled to be complete by August 1, 2005. There is$60,370.29 remaining from the original contract award <br /> amount of $127,829 for this work. Amendment No. 1 extends the time of performance of the existing contract from <br /> August 1, 2005 to December 31, 2005 and expands the scope of work to reach 30%design. An additional $134,558 is <br /> required to reach 30%design. This increases the total amount not to exceed to$262,387($127,829+$134,558). <br /> The current budget for 100% design is$377,828.7. The total project budget is approximately$3 million.Funding for <br /> study,planning and design is provided from two sources: 1)$302,263 from two Federal Transit Administration grants; <br /> and 2) $75,565.75 in local match from Sound Transit(per the Memorandum of Agreement for Intergovernmental <br /> Cooperation with between the city of Everett and Sound Transit dated November 24, 2004). <br /> For its services through 30%design,INCA Engineers,Inc.will be paid an amount up to,but not to exceed$262,387. <br /> RECOMMENDATION: Authorize the Mayor to sign Amendment No. 1 to Professional Services Agreement with <br /> INCA Engineers, dated March 10,2005, for the North Everett Transit Center Project. 1 7 <br /> R1h/AU081005INCA-PSA Amendmentl <br />