Laserfiche WebLink
EXHIBIT A 9 <br /> SCOPE OF WORK <br /> 1. Work to Be Performed <br /> 1. Site visit(s)to determine existing conditions <br /> 2. Select new HVAC equipment <br /> 3. Provide Mechanical Construction Drawings <br /> 4. Provide Electrical Construction Drawings <br /> 5. Provide Structural Drawings(if required for rooftop condensing units) <br /> 6. Provide Division 15 & 16 Specifications <br /> 7. Provide Cost Estimate at 100% CD Phase <br /> 8. Attend pre-bid contractor meeting <br /> 9. Answer questions during construction <br /> 10. Review shop drawings <br /> 11. Complete one (1) site visit at 100% completion <br /> 12. Review Balance Report and O&M Manuals <br /> 49 <br />