My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/10 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:14:08 AM
Creation date
2/15/2017 10:10:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> Criteria for Designation <br /> Areas which include one or more of the following characteristics: <br /> • Areas suitable for public access,water-enjoyment recreational uses, and active recreation <br /> developments. <br /> • Floodplains that have been altered by agricultural activities. <br /> • Areas developed at a very low density or used at a low to moderate intensity, including,but <br /> not limited to residences, agriculture, and outdoor recreation development. <br /> • Areas not planned for intensive urban development that have the potential for ecological <br /> rehabilitation. <br /> Areas Designated <br /> 1. Park zoned properties located south and southeast of the BNSF southeast property <br /> lines between the Mukilteo Tank farm site and the Port of Everett's south terminal <br /> (See Figure 4.10): All of the park zoned properties located south and southeast of the <br /> BNSF property lines, except for the wetlands designated Conservancy. This includes <br /> portions of Howarth Park and Forest Park. <br /> 2. Park zoned properties located above Maulsby Swamp (See Figure 4.17): All of the <br /> park zoned property within 200 feet of the ordinary high water mark of Maulsby Swamp. <br /> 3. Langus Riverfront Park (See Figure 4.19): All of the city-owned property located <br /> east of the ordinary high water mark of the Snohomish River and west of the east edge of <br /> the I-5 right-of-way, except for the cut-off tidal channel. The waterward boundary is the <br /> ordinary high water mark. <br /> 4. South Simpson Site: (See Figure 4.14) All of the Simpson site/BNSF right-of-way <br /> located south of the development pad in shoreline jurisdiction, except for Bigelow Creek <br /> and the Category 1 wetlands and their associated buffers required by the SMP and the <br /> buffer along the Snohomish River required by the SMP. The west boundary is 200 feet <br /> from the OHWM or the floodplain boundary, whichever is further west, except that <br /> where the floodplain boundary is more than 200 feet from the OHWM, shoreline <br /> jurisdiction shall not extend beyond the west edge of the BNSF right-of-way. <br /> 5. Rotary Park find the M-a-r-sl tl-Poperti=---(See Figure 4.20): All of the Rotary Park_ <br /> and Agri-eulture zoned floodw-ay'floodplain south of Lowell a -- ' - _ •- . * ' - <br /> - - - - - ` T • • <br /> The west-north boundary is the OHWM of the Snohomish River. the south boundary is <br /> the northern edge of Lowell Snohomish River Road_ the east and west boundaries are the <br /> City of Everett Rotary Park property lines. 200 feet from the edge of the floodplain or <br /> the boundary with the Shoreline Residential-designated properties, whichever is less. <br /> Vision Statement <br /> f0 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.