Laserfiche WebLink
4 CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Award Construction ADDRESS: 4326 Pacific Hwy <br /> CITY: Bellingham STA 1'h: WA 98226 DATE: July 14, 2005 <br /> PROJECT TITLE: Transmission Line#2 Replacement, Ph 8-A WORK ORDER NO. UP3183 <br /> DATE WORK COMPLETE: June 15, 2005 FINAL AMOUNT: $ 1,338,121.29 <br /> CONTRACTOR'S CERTIFICATION <br /> [, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same .nd that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I may ha ' g out of the performance of said contract, which are not set forth in said estimate. <br /> X \ )• _ J „f/ X 1?f1-S P <br /> CONTRAC OR / TITLE <br /> Award Construction •-P pFULz <br /> • im S�ON F�.o 9 i, <br /> Subscribed and sworn to .efore _o7OAgy 9V/ iio <br /> me th' :.o d y f �i.�l y ,,, — �4- �►I <br /> �1 �_ Notary Public = PUMA 144 <br /> in and for the State of Washington, residing at /If,c1,2-.--N viPt • yr.,,9_30.0��0• � <br /> nF wrS' <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> [ Certify the attached final APPROVED Date: I i / <br /> .-stimate to be based upon actual <br /> measureme'ntts and to be true and correct. i Q <br /> 2<z-irl, X <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> the Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> 'gents and forwarded with the Final Contract Voucher Certification. <br /> Tontractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> devised 9/94 <br />