My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/17 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:25:14 AM
Creation date
2/15/2017 10:24:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" PROJECT TITLE: <br /> Professional Services Consent COUNCIL BILL# <br /> Agreement with KPFF X Action Originating Department Engineering <br /> Consulting Engineers,Inc., for First Reading Contact Person Ryan Sass '1-5 <br /> engineering services related to Second Reading Phone Number (425)257-8942 <br /> the Henry M. Jackson Third Reading FOR AGENDA OF 8/17/05 <br /> Pedestrian Bridge. Public Hearing <br /> Initialed by: <br /> Department Head aj1� <br /> CAA - <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> East Marine View Drive, 2/27/02 Council Vicinity map and Legal <br /> near Jackson Park,to the approved pre-design Agreement <br /> Snohomish Riverfront. agreement with KPFF <br /> Amount Budgeted $ 211,193.00 <br /> Expenditure Required 211,193.00 Account Number(s): PW2935 <br /> Budget Remaining - 0- <br /> Additional Required - 0 - <br /> DETAILED SUMMARY STATEMENT: <br /> This agreement is the second stage in the design of the Snohomish River Pedestrian Bridge project. This <br /> stage will develop the location of a pedestrian and bicycle bridge from East Marine View Drive, in the <br /> vicinity of Jackson Park, to the Snohomish Riverfront. This non-motorized facility is part of the City's <br /> comprehensive trail plan,which includes a trail around the City's north-end peninsula that will ultimately <br /> connect with other bicycle and pedestrian transportation facilities to the north,west, east, and south of <br /> Everett. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with KPFF Consulting Engineers, Inc., for <br /> engineering services related to the Henry M. Jackson Pedestrian Bridge. <br /> wo2935 KPFF PSA CCA.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.