My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/24 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:46:35 AM
Creation date
2/15/2017 10:45:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/24/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avoided Cost calculation for City of Everett- Urinals <br /> Jimmy Zs Restaurant Typical cust. 3pm-2am 11 <br /> 300/day <br /> (a) (b) (c) (d) <br /> Gallons per Flush Gallons per Flush Number of Avg Flushes avg. #cust. using restroom 18 <br /> Exisiting Urinals New Urinals Urinals Per Day 200 <br /> 3.0 0.7 3 18 <br /> (e) (f) (g) (h) Estimated total daily 18,2 <br /> Est Savings Annual Days MG Year Annual CCF <br /> (a-b)*c*d Used (e*f)/1M (e*f)/748.1 <br /> 130 313 0.0 50 Open 6 days/week 313 <br /> (i) (i) (k) (I) <br /> Annual CCF Measure Life Total CCF Avoided Cost <br /> Savings (Years) (ii) (k*$0.53) <br /> 50 20 1,000 $530 <br /> (m) (n) (o) (p) <br /> Est. Urinal Installation Number of Total Cost 481.21 <br /> Cost Cost Urinals (m+n)*o 41.366 <br /> $174 $54 3 $684 12.9 <br /> (q) (r) (s) (t) 162.9 <br /> Cost to City of Everett Total Cost Total Savings Simple Payback 54 <br /> (p*.50) (from q) (from I) (Years) <br /> $342 $342 $530 0.6 <br /> crJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.