Laserfiche WebLink
Avoided Cost calculation for City of Everett <br /> Jimmy Zs Restaurant Typical cust. 3pm-2am 11 <br /> 300/day <br /> (a) (b) (c) (d) <br /> Gallons per Flush Gallons per Flush Number of Avg Flushes 18 <br /> Exisiting Toilets New Toilets Toilets Per Day 200 <br /> 3,4 1.6 11 18 <br /> (e) (f) (g) (h) Estimated total daily 18,2 <br /> Est Savings Annual Days MG Year Annual CCF <br /> (a-b)*c*d+400 Used (e*f)/1 M (e*f)/748.1 <br /> 760 313 0.2 320 Open 6 days/week 313 <br /> (i) (i) (k) (I) <br /> Annual CCF Measure Life Total CCF Avoided Cost 4 leaking toilets 400 <br /> Savings (Years) (i*j) (k*$0.53) (100 gallons/ea/day) <br /> 320 20 6,400 $3,392 <br /> (m) (n) (o) (P) <br /> Est. Toilet Installation Number of Total Cost <br /> Cost Cost Toilets (m+n)*o <br /> $308 $43 11 $3,861 <br /> (q) (r) (s) (t) <br /> Cost to City of Everett Total Cost Total Savings Simple Payback <br /> (p*.50) (from q) (from I) (Years) <br /> $1,931 $1,931 $3,392 0.6 <br /> C.11 <br />