My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
KPFF Consulting Engineers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:45:04 PM
Creation date
2/15/2017 3:44:40 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Bridge
Tracking Number
0000436
Total Compensation
$1,390,791.35
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Park Bridge Construction Management and Construction Support <br /> City of Everett Scope of Work <br /> Exhibit A <br /> This effort will include meeting attendance and coordination with the City of Everett, response to <br /> RFIs, ASIs and submittals, and general communication (emails, phone calls, general consultation). <br /> The City will provide work on the punch list visit and report preparation, and preparation of as-built <br /> for Civil Engineering Design Elements, though KPFF may provide support as needed. <br /> 6. COMBINED SEWER & STORMWATER SUPPORT <br /> HDR will provide the following Sewer& Stormwater services as needed during the construction phase. A <br /> total of 28 hours have been allocated for HDR services. <br /> 6.10— Project Invoicing & Controls <br /> 6.20 —Site Visits <br /> 6.30 — RFIs (4 total) <br /> 6.40 —Submittal Reviews <br /> 7. ARCHITECTURE& BRIDGE AESTHETICS SUPPORT <br /> There is no Architectural Support needed for this phase of construction. <br /> 8. ELECTRICAL ENGINEERING SUPPORT <br /> There is no Electrical Engineering Support needed for this phase of construction. <br /> 9. LANDSCAPE ARCHITECTURE& IRRIGATION SUPPORT <br /> There is no Landscape Architecture & Irrigation Support needed for this phase of construction. <br /> 10. ENVIRONMENTAL SERVICES <br /> Environmental and Permitting support services will be provided on an on-call basis. <br /> 11. ELEVATOR DESIGN SUPPORT <br /> There is no Elevator Design Support needed for this phase of construction. <br /> 12. MECHANICAL SUPPORT <br /> There is no Mechanical Support needed for this phase of construction. <br /> 13. CONSTRUCTION MANAGEMENT SERVICES <br /> There are no Construction Management Services needed for this phase of construction. <br /> kpff <br /> 15 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.