My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
KPFF Consulting Engineers 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 3:45:04 PM
Creation date
2/15/2017 3:44:40 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Bridge
Tracking Number
0000436
Total Compensation
$1,390,791.35
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE: GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 The Greenbusch Group,Inc. Greenbusch <br /> GRAND AVENUE PARK BRIDGE- I Sr.Vertical Vertical <br /> Principal -Transportation Transportation CADD <br /> CONSTRUCTION MANAGEMENT&CSS Specialist Specialist MULTIPLIER <br /> Item SCOPE OF WORK $74 25 $47.60 $27.10 $34 00 2 2944 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal. 0 I 00 0 50 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 _ 0 0 II $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 50 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal. 0 0 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 I 0 0 $0 <br /> 1-11=1E7 ::AllUl <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES I <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> 11.10 Project Management&Administration 4 8 $1,555 <br /> 11.20 Bidding Support _ <br /> 11.21 Answer pre-bid questions I 3 $701 <br /> 11.22 Review substitution requests 2 4 $467 <br /> 11.23 Provide addendum 2 4 5 $857 <br /> 11.30 Design Services During Construction <br /> 11.31 Respond to RFIs(NTE 8) 8 12 $1,620 <br /> 11.32 Review shop drawings and submittals;provide written response 3 6 $701 <br /> 11.33 Provide clarifying sketches as may be required(NTE 3) 2 4 10 $1,247 <br /> Review re-submittal of shop drawings and submittals(NTE 1 re- <br /> 11.34 2 4 $467 <br /> review) <br /> 11.35 Visit site once during construction to review progress;provide written 5 8 $1,043 <br /> memo <br /> 11.36 Perform punchlist at substatial completion;provide writen memo 6 9 $1,215 <br /> 11.37 Perform final completion back-punch;provide written memo 5 8 $1,043 <br /> 11.38 Review O&M manual and provide written comments;(NTE 1 review 4 10 $1,059 <br /> and 1 re-review) <br /> Labor Subtotal: 4 i 50 75 15 $11,976 <br /> . 7111111111111.111110 $65 <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal 0 0 0 0 $0 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 0 0 $0 <br /> Labor Sum: 4 50 75 15 $11,976 <br /> Reimbursable Sum:a $65 <br /> $12,041 <br />
The URL can be used to link to this page
Your browser does not support the video tag.