Laserfiche WebLink
COST ESTIMATE: GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 1 (assume 16 months) <br /> November 22,2016 The Greenbusch Group,Inc. Greenbusch <br /> GRAND AVENUE PARK BRIDGE- I Sr.Vertical Vertical <br /> Principal -Transportation Transportation CADD <br /> CONSTRUCTION MANAGEMENT&CSS Specialist Specialist MULTIPLIER <br /> Item SCOPE OF WORK $74 25 $47.60 $27.10 $34 00 2 2944 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal. 0 I 00 0 50 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 _ 0 0 II $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 50 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal. 0 0 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 I 0 0 $0 <br /> 1-11=1E7 ::AllUl <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES I <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> 11.10 Project Management&Administration 4 8 $1,555 <br /> 11.20 Bidding Support _ <br /> 11.21 Answer pre-bid questions I 3 $701 <br /> 11.22 Review substitution requests 2 4 $467 <br /> 11.23 Provide addendum 2 4 5 $857 <br /> 11.30 Design Services During Construction <br /> 11.31 Respond to RFIs(NTE 8) 8 12 $1,620 <br /> 11.32 Review shop drawings and submittals;provide written response 3 6 $701 <br /> 11.33 Provide clarifying sketches as may be required(NTE 3) 2 4 10 $1,247 <br /> Review re-submittal of shop drawings and submittals(NTE 1 re- <br /> 11.34 2 4 $467 <br /> review) <br /> 11.35 Visit site once during construction to review progress;provide written 5 8 $1,043 <br /> memo <br /> 11.36 Perform punchlist at substatial completion;provide writen memo 6 9 $1,215 <br /> 11.37 Perform final completion back-punch;provide written memo 5 8 $1,043 <br /> 11.38 Review O&M manual and provide written comments;(NTE 1 review 4 10 $1,059 <br /> and 1 re-review) <br /> Labor Subtotal: 4 i 50 75 15 $11,976 <br /> . 7111111111111.111110 $65 <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal 0 0 0 0 $0 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 0 0 $0 <br /> Labor Sum: 4 50 75 15 $11,976 <br /> Reimbursable Sum:a $65 <br /> $12,041 <br />