Laserfiche WebLink
COST ESTIMATE: GRAND AVENUE PARK BRIDGE -CONSTRUCTION MANAGEMENT CSS <br /> PHASE 2 (assume 6 months) <br /> November 22,2016 HDR HDR <br /> GRAND AVENUE PARK BRIDGE - Project <br /> CONSTRUCTION MANAGEMENT & CSS Principal Manager Engineer Controller <br /> MULTIPLIER: <br /> Item SCOPE OF WORK $92.00 $89.59 $42.00 j $46.76 3.0535 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 6 COMBINED SEWER&STORMWATER SUPPORT _ <br /> 6.10 Project Invoicing&Controls 4 $1,118 <br /> 6.20 Site Visits 6 0 $1,641 <br /> 6.30 RFIs-4 total _ 2 4 $1,060 <br /> 6.40 Submittal Reviews 2 8 $1,573 <br /> r Labor Subtotal: 0 12 12 4 $5,393 <br /> $200 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 0 0 0 SO <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 0 0 0 $0 <br /> 10 ENVIRONMENTAL SERVICES <br /> Labor Subtotal: 0 0 00 II $0 <br /> 11 ELEVATOR DESIGN SUPPORT <br /> Labor Subtotal: 0 0 0 0 50 <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal: 0 0 0 0 50 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 0 0 0 $0 <br /> Labor Sum: 0 12 12 4 $5,393 <br /> Reimbursable Sum: $200 <br /> $5,593 <br />