My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stantec Inc. 1/1/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Stantec Inc. 1/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 4:11:55 PM
Creation date
2/16/2017 4:11:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stantec Inc.
Approval Date
1/1/2017
End Date
3/31/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Contract Reassignment 3 Lakes Valve Bypass
Public Works WO Number
UP3611
Tracking Number
0000447
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> MWH® part of Stantec <br /> December 22, 2016 <br /> City of Everett <br /> 3200 Cedar St <br /> Everett,WA 98201 <br /> Attention: Richard Hefti, PE <br /> Reference: Professional Services Agreement for the 3 Lakes Valve Bypass Project <br /> Dated October 24, 2016 <br /> As you may be aware, on May 6th, 2016, MWH Global Inc., and it subsidiaries were acquired by Stantec Inc. <br /> As part of the on-going integration of the service offerings of the combined MWH and Stantec companies, <br /> effective January 1, 2017, MWH Americas, Inc., ("MWH")will be merged into its affiliated corporation Stantec <br /> Consulting Services Inc., ("Stantec") with Stantec as the surviving corporation. Stantec will maintain MWH's <br /> present office locations with no interruption in operations or client services, and all future projects and <br /> operations will be transitioned to the Stantec name in the upcoming months. The Stantec community unites <br /> approximately 22,000 employees working in over 400 locations across six continents. Our work—engineering, <br /> architecture, interior design, landscape architecture, surveying, environmental sciences, project management, <br /> and project economics, from initial project concept and planning through design, construction, and <br /> commissioning—begins at the intersection of community, creativity, and client relationships. With a long-term <br /> commitment to the people and places we serve, Stantec has the unique ability to connect to projects on a <br /> personal level and advance the quality of life in communities across the globe. Stantec trades on the TSX and <br /> the NYSE under the symbol STN.Visit us at stantec.com or find us on social media. <br /> Stantec's vision includes working with the best clients on the best projects and providing the best services. <br /> Accordingly, please be assured that the continuity of your current project will be unaffected by this new <br /> arrangement. The caliber of the personnel currently working on your project will not change and, except for the <br /> assignment requested herein, no other aspect will be affected. <br /> In this regard, we request your approval to assign all existing contracts in the name of MWH to Stantec. Kindly <br /> indicate your consent to the request for assignment by returning a duplicate copy of this letter, executed on <br /> behalf of the City of Everett to Greg Harris <br /> Sincerely, <br /> MWH Americas, Inc. <br /> Gregory S. Harris, P.E. <br /> Project Manager <br /> Enclosures: <br /> Client Letter.PDF <br /> MWH AR Cards.PDF <br /> SCSI W9.PDF <br /> The undersigned hereby consents to the assignment of the Contract noted above to Stantec Consulting <br /> Services Inc. effective January 1, 2017. <br /> City of Everett. <br /> 12, <br /> A. .RC• WO F' M AT ST: <br /> .� � <br /> i � �- / 1. <br /> &<«' ^'"J'r City Clerk <br /> Jr ?S.City Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.