Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION • <br /> IONTRACTOR: Transtech Electric, Inc. ADDRESS: P 0 Box 7429 <br /> IIITY: Kent STATE: WA 98042 DATE: July 25, 2005 <br /> 'ROJECT TITLE: 2004 Signal Improvement WORK ORDER NO. 3182 _ <br /> )ATE WORK COMPLETE: June 24, 2005 FINAL AMOUNT: $ 376,440.03 <br /> CONTRACTOR'S CERTIFICATION <br /> , the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> noni:. due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> inde".tand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> vhi I ma have, arising out o •e performance of said contract, which are not set forth in said estimate. <br /> ( L ,, X Vice President `Z Okla: .T t/f <br /> 1 ' 7' CTOR 1-: 1*-- T T. TITLE Q� "isse"' TG ���i <br /> rranstech Electric, Inc. = a�o �o r� 4 0 <br /> Lary T. Guthmiller y s it 4.3.*%m i <br /> subscribed and sworn t. before % > %i. �o` �' <br /> Q G@ G <br /> •. is ' ' d. .f V.- �'�.,��, �Su <br /> ( ��. .1 1.O A otary Public V1.- <br /> %, ".0���'''si,,,,,„...Ac.)._ <br /> • . - I or the 'to e of Washington, residing at__ _— �'1t° IygSHIN''N``� <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> Certify the attached final APPROVED Date: 1/iI of <br /> stimate to be based upon actual <br /> measurements and to be true and correct. <br /> : , /=2:,--ac,4(:,_ _ X -<__I–C-"Ajr-t9 <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> 'he Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> gents and forwarded with the Final Contract Voucher Certification. <br /> 'ontractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> ttached. <br /> .evised 9/94 <br /> 8 <br />