Laserfiche WebLink
,,.. , ua,c. •.. ."-..w telly di CVUTULI .ruulic VVWI.S L/t'pelll(IIVIII tiuwn ua,c, vv�wv <br /> Time:, 2:30 PM , Contract Estimate Voucher <br /> Project: 183 For Work Order#3182 Contractor: TRANSTECH ELECTRIC,INC. <br /> 2004 SIGNAL IMPROVEMENTS Estimate#6 P 0 BOX 7429 <br /> WO 3182 BID:$2667494.40'k 3 74p,44-0.o3 KENT WA 98042 <br /> TOTAL BID:$36649810 A 514944-p.03 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 33,200.00 1.00 1.0000 1.0000 0.0000 33,200.00 33,200.00 0.00 <br /> 0002 Malnt.&protection of traffic control LS 6,720.00 1.00 1.0000 0.7500 0.2500 6,720.00 5,040.00 1,680.00 <br /> 0003 Traffic control labor HR 42.00 400.00 416.5000 318.5000 98.0000 17,493.00 13,377.00 4,116.00 <br /> •004 Construct tr ctrl signal system:Colby&Pacific LS 163,252.00 1.00 1.0000 1,0000 0.0000 163,252.00 163,252.00 0.00 <br /> 0005 Construct tr ctrl signal system:Rucker&37th LS 115,745.00 1.00 1.0000 1.0000 0.0000 115,745.00 115,745.00 0.00 <br /> 0006 Construct elec service:Rucker&40th LS 5,920.00 1.00 1.0000 1.0000 0.0000 5,920,00 5,920.00 0.00 <br /> 0007 Existing private Improve ment restoration FA 1.00 3,000.00 2,890.9100 0.0000 2,890.9100 2,890.91 0.00 2,890.91 <br /> 0008 Cement concrete curb ramp,class 2 EA 1,942.50 4.00 4.0000 2.0000 2.0000 7,770.00 3,885.00 3,885.00 <br /> 0009 Remove cement concrete sidewalk SY 94.49 10.00 86.6000 66.2000 20.4000 8,182.83 6,255.24 1,927.60 <br /> 0010 Remove cement conc rete curb&gutter LF 47.72 30.00 34.0000 34,0000 0.0000 1,622,48 1,622.48 0.00 <br /> 0011 Sawing pavement LF 9.98 50.00 100.0000 100.0000 0.0000 998.00 998.00 0.00 <br /> 0012 Crushed surfacing top course TN 110.25 2.00 1.0000 1.0000 0.0000 110,25 110.25 0.00 <br /> 0013 Cement concrete sidewalk SY 94.49 10.00 89.7700 89.7700 0.0000 8,482,37 8,482.37 0.00 <br /> 0014 Cement conc,curb&gutter,Type A-1 LF 49.51 30.00 31.6000 31.6000 0.0000 1,564.52 1,564.52 0.00 <br /> 0015 24"plastic crosswalk stripe LF 3.83 420.00 390.0000 52.8000 337.2000 1,493.70 202.22 1,291.48 <br /> 0016 24"Plastic stop line LF 3.83 110.00 109.0000 107.0000 2.0000 417.47 409.81 7.66 <br /> 017 Plastic traffic arrow EA 78.75 2.00 2.0000 2.0000 0.0000 157.50 157.50 0.00 • <br /> 0018 Plastic wide line LF 2.10 100.00 100.0000 102.0000 -2.0000 210.00 214.20 •4.20 <br /> 0019 Remove plastic stop line SF 5.25 20.00 20.0000 12.0000 8.0000 105.00 63.00 42.00 <br /> 0020 Remove raised pavement markers EA 2.10 30.00 50.0000 0.0000 50.0000 105.00 0.00 105.00 <br /> Work Order Totals: 376,440.03 360,498.59 15,941.44 <br />