Laserfiche WebLink
4 <br /> CERTIFICATE OF COMPLETION <br /> Project: Biosolids &Backwash Solids Removal, Phase 2 <br /> Contractor: Residuals Processing, Inc. <br /> Work Order No. 2600-4 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> „.I _ . . i //' : i , <br /> ?iefr <br /> • ies Direct:r Drat <br /> 't Thetfordoll <br /> / <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br />