Laserfiche WebLink
9 <br /> V. SCHEDULE FOR PROJECT COMPLETION <br /> List each proposed grant activity separately estimating the start and <br /> completion dates. This should be a complete listing of all potential activities <br /> associated with the grant including the two draft submittal dates of May 26, <br /> 2006 and July 21, 2006. A start date and completion date are not sufficient <br /> for the Schedule of Project Completion. <br /> Estimated Estimated <br /> WORK TO BE ACCOMPLISHED Starting Date Completion Date <br /> 1. Design Detail Handout <br /> Meet with Historical Commission to draft <br /> list of details to be drawn 10/01/06 10/31/06 <br /> Obtain bids and hire consultant 11/01/05 12/31/05 <br /> Meet with consultant to discuss details and 01/02/06 02/15/06 <br /> define scope of work <br /> Consultant work on detail drawings and 02/16/06 03/31/06 <br /> staff work on photographs <br /> Staff layout of handout 04/01/06 04/30/06 <br /> Review draft handout with Historical <br /> Commission 05/1/06 05/15/06 <br /> Draft submitted to OAHP for review 05/15/06 <br /> Revised draft submitted to OAHP 07/15/06 <br /> Finalize handout and submit to OAHP 07/1/06 08/31/06 <br /> 2. CLG Program <br /> Prepare for and conduct monthly Historical <br /> Commission meetings 10/01/05 09/30/06 <br /> Review projects in historic overlay zones 10/01/05 09/30/06 <br /> Submit draft report on CLG activities for 05/15/06 <br /> the year to OAHP <br /> Submit second draft report to OAHP 07/15/06 • <br /> Submit final report 09/15/06 <br /> 70 <br /> 14 <br />