My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/09/21 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/09/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 8:37:26 AM
Creation date
2/17/2017 8:37:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/21/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CO <br /> P O LL D Dedicated to creative, <br /> responsive.quality solutions <br /> e n G I n e e r S for those se serve. • <br /> • <br /> Exhibit A-2 YE4R <br /> oF SERVICE <br /> Weyco Intertie and Rehabilitation Pipeline- <br /> Request for an Amendment to the Original Contract <br /> September 1, 2005 <br /> 6919A10 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Attention: Souheil Nasr, P.E. <br /> Subject: Weyco Intertie Pipeline <br /> Dear Souheil: <br /> The purpose of this letter is to request an amendment to the original contract for the <br /> evaluation of and the design of an intertie to the Weyco Pipeline. Work tasks performed to <br /> date have nearly exceeded the original budget. The items included in the amendment will <br /> reflect additional effort for the design of modifications, requested by the City during a <br /> meeting earlier this month, to the intertie between Pipeline No. 2 and 3, and to complete the <br /> remaining design tasks and miscellaneous support services during bidding and construction. <br /> Specifically, the design is to be modified so that Pipeline No. 2 is the main feed line to the <br /> Weyco Intertie Pipeline. This change will require more complicated piping alignment and <br /> valving. <br /> The original contract budget was impacted by several factors including the items and <br /> activities noted below: <br /> • The inclusion of elements of Phase A, which included various improvements and <br /> upgrades to make the Weyco Pipeline operational. These tasks were not originally <br /> budgeted and included: several additional meetings, preparation of three new plan <br /> sheets, modifications to six existing plan sheets, and the generation and incorporation of <br /> some additional specifications into the bidding documents. <br /> • The preparation of a memo describing the costs of sliplining the Weyco Pipeline. <br /> • Extended project duration, which affected the fee schedule used and the project <br /> momentum. The original contract envisioned an accelerated, four-month design <br /> schedule beginning in February 2004 and complete in June 2004. While we have been <br /> 1218 THIRD AVENUE, SUITE 1600 • SEATTLE, WASHINGTON 98101-3032 • (206) 684-6532 • FAX (206) 903-0419 <br /> H:\Clientll=verett_SEA\6919A10-Weyco1PrjctMngmnt\WeycoAmndmnt\Weyco-Amendment_Exhidt A-2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.