My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/09/28 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/09/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 2:29:21 PM
Creation date
2/17/2017 8:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/28/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Parcel 3: <br />Tract 2, as depicted on that certain Boundary Line Adjustment No. 1474-04-002, record <br />of survey, as recorded under Auditor's File Number 200402195093, records of <br />Snohomish County, State of Washington; <br />EXCEPT all of Block 1, J S Sines Acre Tracts <br />Parcel 4: <br />That portion of Government Lot 3, Section 29, Township 29 North, Range 5 East, W.M., <br />in Snohomish County, Washington, described as follows: <br />Beginning on the South line of Government Lot 3, 1019.4 feet East of the Southwest <br />corner of said Lot, same being on the East line of the land conveyed to Seattle and <br />Montana Railroad Co. by Warranty Deed recorded April 24, 1902 in Volume 71 of <br />Deeds, page 77; <br />Thence East along said South line of Government Lot 3 a distance of 256.8 feet to the <br />West right of way line of Everett & Monte Cristo Railway Co. as conveyed by deed <br />recorded March 9, 1898 in Volume 46 of Deeds, Page 40; <br />Thence Northerly along West line of said right of way 641.6 feet to the South line of Plat <br />of Everett Land Company's First Addition to Everett, according to the plat thereof <br />recorded in Volume 3 of Plats, Page 20, extended Easterly; <br />Thence Westerly along said production of the South line of said plat and the South line of <br />said plat 165.39 feet to the Easterly line of the right of way of said Seattle & Montana <br />Railroad Co.; <br />Thence angle Left 750 45' and proceed Southerly along Easterly line of said right of way <br />314 feet to point of curve to the left; <br />Thence along said curve, radius of 1392.69 feet, a distance of 341 feet to Point of <br />Beginning. <br />Parcel 5: <br />All that part of Lots 17 to 32, inclusive, Block 805, Plat of Everett Land Company's First <br />Addition to Everett, according to the plat thereof recorded in Volume 3 of Plats, page 20, <br />records of Snohomish County, Washington, lying Easterly of the Easterly line of the right <br />of way of St. Paul, Minneapolis and Manitoba Railway Co., which Easterly right of way <br />line is described in Volume 79 of deeds, Page 501, as Beginning at a point on the North <br />line of said Lot 32 that is 25.8 feet West of the Northeast corner of Block 805; <br />Thence Southwesterly parallel to and 100 feet distant southeasterly from centerline of <br />said Railway Co. right of way to intersect the West line of Lot 19 at a point 65.3 feet <br />North of the Southwest corner of Lot 17, all in said Block 805. <br />License For Use Of City Property <br />KL13 Construction, Inc. <br />Page 6of6 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.