My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/10/05 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/10/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 9:11:21 AM
Creation date
2/17/2017 9:10:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— - _ _ <br /> - <br /> PROJECT TITLE: <br /> Consent COUNCIL BILL# <br /> Transmission Line No. 4 X Action Originating Department Public Works A <br /> Joint Bonding Project - First Reading Contact Person Mark Sadler !GA-� <br /> Award of Construction Second Reading Phone Number 8967 <br /> Contract Third Reading FOR AGENDA OF October 5,2005 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> See map. Approval of Bid Call <br /> Amount Budgeted $950,000 CIP budget UP - 3222 <br /> Expenditure Required $ 531,975.50 <br /> Budget Remaining Over$ 400,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project will install joint bonds on the No. 4 Transmission line to make the pipe electrically conductive <br /> thus allowing a cathodic protection system to be operable on the 4 line, and the Nos. 2 and 3 transmission <br /> lines as well. The project will be from the crest of Cavalero Hill on the west to essentially the Pilchuck <br /> River. At the completion of the project all three transmission lines will have a corrosion protection system <br /> installed along this section, thus prolonging the service life of these assets. <br /> Staff has reviewed the bids and recommends awarding to the lowest responsive bidder. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the award of the Transmission Line No. 4 Joint Bonding Project to Epic Construction, LLC in the <br /> amount of$531,975.50. <br /> 5 <br /> S:\MSadler\WORD\3222-4 line 05 bonding\councl agenda 100505 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.