My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1401 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
1401
>
1401 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:45:14 PM
Creation date
2/17/2017 3:44:59 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1401
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> ,. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the c:rainage system provided for this lot. <br /> 8. Rooftop runo(f must be discharged to a roof downspoul infiltration system per City of Everett Slorm <br /> Manual 3-2.6.2. The approximale size trench is 3.5' wide, 2'deep and 25' long. See attachment for <br /> more detai!,. <br /> �9. The contreclor must meet wilh the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the projecl. <br /> (0.� Install erosion control measures as determined by the Public Works inspeclor, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion confrol measures per City of Everett Standards for small parcels <br /> 12 , Remove erosion control measures upon completion of the project prior to (inal approval of the permit. <br /> 13. All excavated material from foundation, sidewalk. and driveways shall be liauled lo an approved, <br /> permitted sile. No wasling of malenal is allowed on lhis building lol. <br /> (1� No dirl, mud, rocks or debris to be tracked onto roadway. <br /> � . <br /> �15.� No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> � pedestrian lravel. <br /> 1G. Adjust uialer meter box 1"above sidewalk grede. <br /> 17. Remove and replace curb, gutler and sidewalk as per City of Everell Standard Plan #'s 305A& 306 on <br /> this proposal's fronlage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrele driveway per City of Everett Standard#307. <br /> i]!ir <br /> ��19. ; Pave driveway from the'fts�i-property line out lo the�paving. <br /> 20. Contact the Water Uistrict for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 wilfi a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across the public riglri-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> PN'Commeni5 �2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.