My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2218 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
2218
>
2218 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 5:50:30 PM
Creation date
2/17/2017 5:50:20 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2218
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, , REPAIR SPF.CS: :ATIONS A�D LIST OP WORK � BE B1D <br /> G? Page 2 cf� �U <br /> Address : Z Z I C� L f;►Y1 {�a,VGJ <br /> 1. Roofina Tear off existing roofing on house complete <br /> to skip sheathing. Replace starter boards throughout. <br /> Point out any additional areas of rotted wood to �he <br /> Housing Improvement Advisor before covering. Legally <br /> dispose of all materials. <br /> Install new 3/8" CDY. plywood sheathing over entire roof, <br /> stagger joints. install new 158 asphalt impregnated <br /> felt over entire roof. Install new anodized metal .drip ' <br /> edge on all rake edges. Replace all sleeves on plumbing <br /> vents and gas vents. Replace metal flashings at all <br /> roof-to-wall junctions. <br /> Install new roofing throughout. Rouf sections under <br /> 4:12 pitch : receive selvage edge roll roofinq, 90#. <br /> Sections over 4:12 pitch : receive 220# fibetglass � <br /> shingle roofing. All roofing : installed in accordance <br /> with manufacturer 's recommendations, contractor • � <br /> register date of application with roofing manufacturer. <br /> Owner choice of roofing color, roll and shingles to <br /> match. <br /> $�a� �' <br /> H '~*] <br /> 2. Gutters Tear off existing gutters and downspouts n � <br /> complete. Replace any rotted faci.a to match existing. j Q <br /> Install new continuous aluminum gukters and downspouts. � <br /> Gutters : 5" , 'R' style, owner choice of color. Secure i � <br /> gutters with spikes 48" O.C. into rafter tails. Slope <br /> to dxain to downspouts. Secure downspouts top, bottom <br /> and at all 7oints. Provide precast concrete -i � H <br /> splashblocks at all downspouts, iO z <br /> � "SSd "�' � ! � � <br /> H H <br /> i < <br /> 3. Exterior Sidin Repair tongue-and-groove aoffit on � � � <br /> west end of house. Fill with new materials to match � � <br /> existing. Replace plywood sofiit materials throughout H <br /> with 3/8" 303 plywood, rough sawn. Replace any pieces ; N <br /> of cracked oc broken teveled siding on east and . � <br /> southeast dormers. Patch siding on north side, east end N <br /> with singles to match. Finish application of T1-11 � <br /> plywood on north side of storage room on west end of <br /> hou�e after removing paneling, install vertical 1 x 4 <br /> lapped corner boards on T1-11. Caulk all seams and � <br /> cracks at windows, doors, corners, and changes in <br /> materials with acrylic based paintable caulk . Feplace � <br /> damaged gable end vent, west side, upper dormer. <br /> , H <br /> � - (!1 <br /> Power wash entire house siding. Scrape all loose and � <br /> peeling paint on all wood surfaces. Apply one coat of <br /> exterior oil base wood primer to all new and bare wood � <br /> surfaces. Paint house complete, two coats, two colors, <br /> owner choice of color, exterior oil base paint. <br /> Replace rear deck material with new clear fir <br /> tongue-and-groove decking. Prime with oil based wood <br /> primer and pain�, two coats oil base deck paint, owner <br /> choice of coloz . • <br /> � � -� �a -� <br />
The URL can be used to link to this page
Your browser does not support the video tag.