Laserfiche WebLink
, Ltr. Maloy Constructioq- � <br /> ' October 1, 2001 �.. � <br /> Page 2 <br /> Piease prepare a response letter showing where each item in this correction letter is addressed on <br /> the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submitt.�:s shall be of su�cient detail and contain sufficient information to ensure that <br /> the proposed structure will be constructed in compliance with all adopted codes. . <br /> Sincerely, <br /> /����u'�. <br /> Jeff Heilman <br /> Development Techrician <br /> �EUI/PLNCKAISTRMEILAIdNItl0109�019 p1_'6 LOAIBARD AVE) �LJ <br />