My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2500 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
2500
>
2500 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 6:17:18 PM
Creation date
2/17/2017 6:17:17 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,-� <br /> CIASED CM WORK ORDEk� REPORT <br /> Ci�y oE Everett Total Utility Maintenance Managc�ment System <br /> 02/15/1994 Page 1 <br /> __:,________________________________________________________________._____________ <br /> Daie Rang� :02/O.1/1992 - 02/14/1994 <br /> r14t,'nrk Order Range :<Blank> - 640542108U229 Pattern :740119675n773 <br /> Icem Range :<Hlank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ZD: 7401196750773 Title: KILL 35G0 IAMBARD kPPP.;f5531 <br /> «DUPLICATE ?RINTING OF TAIS WORR OP,DER» AVE <br /> Item ID: -- <br /> Location ID: -- <br /> Program 74o F�nction 119 Activity 675 <br /> Date Completed: 02/14/1994 <br /> Overall CrafL: <br /> Is�ued: 02/11/139�4 Issued by: SI:L Assigned to: <br /> Oat of Ser✓ice? NO Priority: Travel Time: O.OQ Hr. <br /> Meter Reading: <br /> � Downtime: 0 hours <br /> Status: <br /> Labor: <br /> ('raft ID Name Planned Hrs I�ctual Hrs Cost <br /> _____ ______ _'.__.__________________________ ___________ __________' __________ <br /> WST SRJ STENSET2i� ROHERT J. 0.00 3.00 56.77 <br /> UL TDE1 THOMFSON� DWrIYNE E. 0.00 3.00 41.01 <br /> Total Labot Coet: 99.78 <br /> Vehicles: <br /> TD Description Date Hours Cost <br /> ____________ ______________________________ ________ ______ __________ <br /> V21J9 S4C TRUCK CHEV 86 02/14/1994 3.00 15.3U <br /> Total Vehicle Cost: 15.30 <br /> Total cost for work order 74011967507)3: 115.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.