Laserfiche WebLink
REMOVING EXISTING STRUCTURES: <br />It will ne necessary to remove several existing driveway approaches and side- <br />walk extensions, concrete curbs and bulkheads. The Contractor shall remove such <br />structures for a distance of one ft. back of the back line of the sidewalk. Fowever, <br />if so directed by the Engineer the Contractor shall remove said structures for a <br />greater distance than the one ft. The Contractor will exercise utmost care so as <br />not to disturb or break up any more of the structure than is necessary. <br />Then replacement of a structure is to be made, the Contractor shall fit the <br />work and make the new work conform to the grade and alignment, as near as possible, <br />to the existing improvements. <br />Payment for this work shall be paid for on the basis of the unit price bid <br />for the various removal items, and the unit price bid for the various replacement <br />items, and no additional compensation shall be made. <br />RESTORATION OF IMPROVEHMITS:• <br />Restoration of Improvements shall be in accordance with the Standard Specifica- <br />tions or as hereinafter provided. <br />Upon completion of the improvement, the Contractor shall replace all mail boxes, <br />stepping stones, sign posts, shrubs, etc. The cost of this work shall be included <br />in the unit price bid for the various items in the proposal. <br />SELECTED ROADWAY BORROW: <br />All Selected Roadway Borrow shall conform to the roauirements of Sec. 22, and <br />amendments thereto, of the Standard Specifications of the State of Mash. Dept. of <br />Highways. <br />Selected Roadway Borrow shall. be spread as directed by the Engineer in charge <br />during construction and compacted in accordance with the requirements of those <br />specifications before material for the succeeding course is spread. <br />Selected Roadway Borrow will be measured by volume in trucks at the point of <br />delivery on the street. <br />The unit contract price bid for "Selected Roadway Borrow" shall be full <br />componsation for furnishing and placing the specified material either as special <br />backfill material or for any other use specified by the City Engincor. <br />171!OVAL OF EXISTING CULVERT PIPES: <br />It is the intent of these specifications that the Contractor shall salvage as <br />Tinich of the culvert pipe as possible. This shall be removed and laid to one side <br />for picking up, either by tie City or the proporty ovnor. The cost of doing this <br />i•rork shall be included in the unit price bid for the vc.rious items in the contract. <br />Ile additional compensation will be made. <br />Any openings made in the salvage operations shall be backfillcd and thoroughly <br />compactod with suitable material. <br />6. <br />