My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3017 LOMBARD AVE 2018-01-02 MF Import
>
Address Records
>
LOMBARD AVE
>
3017
>
3017 LOMBARD AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 7:48:52 AM
Creation date
2/17/2017 7:21:42 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3017
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- <br /> � � � !�.� ��I <br /> ro � y To File <br /> � ,.:, `_ � . : <br /> � y `� FFOM Tim Tyler, Building Official , an ' � <br /> K � � Paul Roberts, Director of Planning and Community Development i ��� <br /> ,�'`� <br /> � H � oare ��arch 21 , 1990 i <br /> ."�+.�.'� <br /> y N ~ SUBJEGT �ITY OF EVERETT.EVEFETT WASMRIGTON ' <br /> m o � SENIOR HOUSING PROJECT - PARKING __ __ .. <br /> H O <br /> � (�j C <br /> G1 � f1 <br /> � ,. � This memo outlines how the special property use permit for the Everett <br /> y Nousing Authority's senior housing project, SPU 18-88, relates to the <br /> o m y issuance of building permits for said project. <br /> o H <br /> n G a7 <br /> � � r S�U 18-88 authoriied the remodel of the Senior Center activity room, <br /> yo y construction of an eight-story housing tower and a two-story parking <br /> structure. The permiC also stated that parking will be provided for 159 <br /> vehicles. At this point in time the Senior Center remodel has already been <br /> constructed. When permit applications were submitted for the remodel , <br /> concurrent applications for the parkir�g and the building were not required. <br /> In consultation with the Planning Department which is responsible for the <br /> administration of the Zoning Code, it was determined that applications for <br /> the parking need not be made at the same time as applications for the other <br /> structures so long as the park �ng is ultimately provided prior to the <br /> completion of the housing and remodel projects authorized by the SPU. <br /> If the Everett Housing Authority desires to obtain a building permit for the <br /> construction of the housing tower prior to applying for a building permit <br /> ,'� for the parking structure, it would be issued provided the application meets <br /> � 0�� all code requirements. However, assuming they proceed in this manner, in <br /> order to ensure that the requisite parking will be provided, the following <br /> ; wouid be required: 1 ) Everett Housing Authority represents to the City that <br /> � they will in fact provide the parking spaces required in the SPU for the <br /> Iw w� Housing Authority's structure; 2) the issuance of the Certificate of <br /> Occupancy for the housing tower would be contingent upon the Housing <br /> Authority first providing the required parking spaces; and 3) the Everett <br /> Housing Authority would have to assume all risks attendant with their <br /> � ��`q proceeding in this phased manner. <br /> � <br /> cc: Mayor Kinch <br /> Bob Landles <br /> �"� Bruce Jones/Jim Iles <br /> ��1 (4544) f <br /> � � V ' �� <br /> � �.�.�1 �.th . � � <br /> \ � <br /> !>� , <br /> / ��_ ; 1,;� <br />
The URL can be used to link to this page
Your browser does not support the video tag.